🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Tween Bridge Solar Park

Tween Bridge Solar Park is a 590 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Trent Valley North Connection Node B 400kV Substation, with capacity due from November 2032. The connection agreement is held by RWE Renewables UK Solar and Storage Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Nov 2032 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001990-2
Customer
RWE Renewables UK Solar and Storage Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
590 MW
Change in this agreement
+250 MW
Capacity effective from
30 November 2032
Connection site
Trent Valley North Connection Node B 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near Trent Valley North Connection Node B · Grid map

Other projects at Trent Valley North Connection Node B 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem