🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Ninfield Green Energy Centre

Ninfield Green Energy Centre is a 600 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Ninfield 400kV Substation, with capacity due from October 2031. The connection agreement is held by Ninfield Ng Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002163
Customer
Ninfield Ng Limited
Technology
Demand, Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
600 MW
Change in this agreement
+600 MW
Capacity effective from
31 October 2031
Connection site
Ninfield 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Ninfield · Grid map

Other projects at Ninfield 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem