Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Navenby GEC (Ethos Green)

Navenby GEC (Ethos Green) is a 580 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Navenby 400kV Substation, with capacity due from October 2033. The connection agreement is held by Navenby Green Energy Centre Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003936
Customer
Navenby Green Energy Centre Ltd
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
580 MW
Change in this agreement
+580 MW
Capacity effective from
30 October 2033
Connection site
Navenby 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Navenby · Grid map

Other projects at Navenby 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem