Grid infrastructure β€Ί Connection queue β€Ί Solar + storage

SOLAR + STORAGE Β· NGET

Springwell

Springwell is a 400 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Navenby 400kV Substation, with capacity due from October 2029. The connection agreement is held by Springwell Energyfarm Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001850-1
Customer
Springwell Energyfarm Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
400 MW
Change in this agreement
+400 MW
Capacity effective from
30 October 2029
Connection site
Navenby 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Navenby Β· Grid map

Other projects at Navenby 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem