🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Solar + storage projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown569220.5 GW in total
In planning513scoping or awaiting consent
Consented or building47closest to connecting
Built9connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

569 projects · page 5 of 12
ProjectCapacityStageConnection siteFrom
Wakeleys BESS
Solar + storage · Epl Newco6 Limited
480 MWScoping Wakeleys 400kV
National Grid (England & Wales)
Oct 2033
West Burton Solar Project
Solar + storage · West Burton Solar Project Limited
480 MWConsents Approved West Burton 400kV Substation
National Grid (England & Wales)
Oct 2028
Noventum -Long Stratton
Solar + storage · Noventum Power Solar 8 Limited
460 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Alderton PV & BESS Station
Solar + storage · Bnrg Albion Limited
450 MWScoping East Claydon 400kV Substation
National Grid (England & Wales)
Oct 2037
Alyth
Solar + storage · Ecodev (Alyth) Ltd
450 MWScoping Alyth Solar and Battery 400/132kV
SSEN Transmission (north Scotland)
Oct 2029
Ayr Flexpower
Solar + storage · Ayr Flexpower Limited
450 MWScoping Ayr Dbb 275Kv Substation
SP Transmission (south Scotland)
Oct 2037
JG Pears
Solar + storage · Jg Pears Grid Connection Limited
450 MWBuilt High Marnham 275kV Substation
National Grid (England & Wales)
Oct 2033
New Cumnock BESS
Solar + storage · New Cumnock BESS Ltd
450 MWScoping New Cumnock 275/132kV Substation
SP Transmission (south Scotland)
Oct 2033
Yaxley GEC (Ethos Green)
Solar + storage · Yaxley Green Energy Centre Ltd
450 MWAwaiting Consents Yaxley 400kV Substation
National Grid (England & Wales)
Oct 2031
Pollington Hybrid
Solar + storage · Edf Energy Renewables Limited
440 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Indian Queens
Solar + storage · Gridmove Ltd
437 MWScoping Indian Queens 400kV Substation
National Grid (England & Wales)
Oct 2031
Staythorpe (BESS and PV)
Solar + storage · Sse Staythorpe Power Limited
437 MWConsents Approved Staythorpe 400kV Substation
National Grid (England & Wales)
Sep 2028
Alyth Energy Storage And Solar
Solar + storage · Private Energy Partners (UK) Ltd
400 MWScoping Alyth 400kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Bicker Fen
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Boom Power Feckenham Generation Hub
Solar + storage · Wheaten Hill BESS Limited
400 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2033
Capenhurst
Solar + storage · Enso Green Holdings Q Limited
400 MWScoping Capenhurst 275kV Substation
National Grid (England & Wales)
Sep 2033
Cellarhead
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Cellarhead 400kV Substation
National Grid (England & Wales)
Oct 2033
Cellarhead Green Energy Centre
Solar + storage · S & C Energy Limited
400 MWAwaiting Consents Cellarhead 400kV Substation
National Grid (England & Wales)
Oct 2028
Cellarhead PV & BESS Station
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Manchester South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Chickerell
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Chickerell 400kV Substation
National Grid (England & Wales)
Oct 2038
Cilfynydd
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2030
Cilfynydd Green Energy Centre
Solar + storage · Cilfynydd Ng Limited
400 MWAwaiting Consents Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2029
Cottam-Ryhall Solar & BESS
Solar + storage · Crh Renewables Limited
400 MWScoping Trent Valley South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Drakelow Green Energy Centre
Solar + storage · Drakelow Ng Limited
400 MWAwaiting Consents Drakelow 400kV Substation
National Grid (England & Wales)
Apr 2028
Drakelow PV & BESS Station
Solar + storage · IBV Elford Park Solar Limited
400 MWScoping Drakelow 400kV Substation
National Grid (England & Wales)
Oct 2037
Elmya Morningside BESS & PV
Solar + storage · Elmya Rpc UK Morningside Limited
400 MWScoping Elmya Morningside 400kV Substation
SP Transmission (south Scotland)
Oct 2033
ER MKH Energy
Solar + storage · Er Project Development Co Limited
400 MWScoping Market Harborough 400kV Substation
National Grid (England & Wales)
Oct 2033
Exeter Main
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Exeter 400kV Substation
National Grid (England & Wales)
Oct 2033
Feckenham
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2036
Feckenham PV & BESS Station
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2037
Hams Hall Green Energy Centre
Solar + storage · Hams Hall Ng Limited
400 MWScoping Hams Hall 400kV Substation
National Grid (England & Wales)
Oct 2028
Harker Green Energy Centre
Solar + storage · Blackdyke BESS Limited
400 MWAwaiting Consents Harker 400kV Substation
National Grid (England & Wales)
Oct 2028
Heckington Fen Solar Park
Solar + storage · Ecotricity (Heck Fen Solar) Limited
400 MWScoping Bicker Fen 400kV Substation
National Grid (England & Wales)
Oct 2028
HECWE Dungavel Wind Farm
Solar + storage · Spirebush Ltd
400 MWAwaiting Consents Spirebush 132kV Substation
SP Transmission (south Scotland)
Jul 2028
Heysham Green Energy Centre
Solar + storage · Heysham Green Ng Limited
400 MWAwaiting Consents Middleton 400KV Substation
National Grid (England & Wales)
Oct 2028
High Marnham 400
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents High Marnham 400kV Substation
National Grid (England & Wales)
Oct 2033
Ironbridge Green Energy Centre
Solar + storage · Ironbridge Green Ng Limited
400 MWAwaiting Consents Ironbridge 400kV Substation
National Grid (England & Wales)
Oct 2029
Kearsley North Green Energy Centre
Solar + storage · Kearsley North Green NG Limited
400 MWScoping Kearsley 275kV Substation
National Grid (England & Wales)
Oct 2028
Kingsnorth Power Station
Solar + storage · Qe Kingsnorth Spv Limited
400 MWScoping Kingsnorth B 400Kv Substation
National Grid (England & Wales)
Oct 2032
Kirkby Green Energy Centre
Solar + storage · Kirkby Green Ng Limited
400 MWScoping Kirkby 275kV Substation
National Grid (England & Wales)
Oct 2028
Langage 400
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Langage 400kV Substation
National Grid (England & Wales)
Oct 2038
Legacy 400
Solar + storage · Enso Green Holdings Limited
400 MWScoping Legacy 400kV Substation
National Grid (England & Wales)
Oct 2037
Littlebrook GEC (Ethos Green)
Solar + storage · Littlebrook Green Energy Centre Ltd
400 MWAwaiting Consents Rowdown 400kV Substation
National Grid (England & Wales)
Oct 2031
Long Stratton 400
Solar + storage · Enso Green Holdings X Limited
400 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Low Harker BESS
Solar + storage · Energi Generation 14 Ltd
400 MWScoping Harker 400kV Substation
National Grid (England & Wales)
Nov 2037
Maltby Dev.
Solar + storage · Firma Vogt Solar Ltd
400 MWScoping Thurcroft 275kV Substation
National Grid (England & Wales)
Oct 2034
Monk Fryston
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Monk Fryston 400kV Substation
National Grid (England & Wales)
Oct 2031
Newchurch
Solar + storage · Littleton Pastures Solar Limited
400 MWScoping Newchurch 400kV Substation
National Grid (England & Wales)
Oct 2031
Norton
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Norton East 400kV Substation
National Grid (England & Wales)
Oct 2032
Norwich Green Energy Centre
Solar + storage · Norwich NG Limited
400 MWAwaiting Consents Norwich Main 400kW Substation
National Grid (England & Wales)
Apr 2031
Page 5 of 12

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.