Grid infrastructure β€Ί Connection queue β€Ί Solar + storage

SOLAR + STORAGE Β· NGET

Newchurch

Newchurch is a 400 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Newchurch 400kV Substation, with capacity due from October 2031. The connection agreement is held by Littleton Pastures Solar Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002056
Customer
Littleton Pastures Solar Limited
Technology
Demand, Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
400 MW
Change in this agreement
+400 MW
Capacity effective from
4 October 2031
Connection site
Newchurch 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Newchurch Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem