Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,329586.0 GW in total
In planning968scoping or awaiting consent
Consented or building149closest to connecting
Built212connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,329 projects · page 27 of 27
ProjectCapacityStageConnection siteFrom
Broadditch BESS
Battery storage · Harmony BD Ltd
12 MWBuilt Northfleet East 132kV
National Grid (England & Wales)
Abedare
Gas · UK Power Reserve Limited
10 MWBuilt Upperboat 132kV Substation
National Grid (England & Wales)
Cwm Dyli
Hydro and pumped storage · RWE Generation UK Plc
10 MWBuilt Trawsfynydd 275kV Substation
National Grid (England & Wales)
Huntworth
Gas · UK Power Reserve Limited
10 MWBuilt Taunton GSP
National Grid (England & Wales)
Hutton Battery Storage
Battery storage · Osspv001 Limited
10 MWBuilt Hutton 400kV Substation
National Grid (England & Wales)
Sevington
Gas · UK Power Reserve Limited
10 MWBuilt Sellindge 132kV Substation
National Grid (England & Wales)
Solutia
Gas · UK Power Reserve Limited
10 MWBuilt Uskmouth 132kV Substation
National Grid (England & Wales)
Holes Bay
Battery storage · Harmony Hb Limited
7.5 MWBuilt Holes Bay Battery Storage
National Grid (England & Wales)
Green frog @ The Drove
Gas · Viridis 178 Limited
6 MWBuilt Bridgwater 400/132kV Substation
National Grid (England & Wales)
PeakGen BEGA - Coventry
Gas · Peak Gen Top Co Limited
6 MWBuilt Coventry GSP
National Grid (England & Wales)
PeakGen BEGA - Hatfield
Gas · Peak Gen Top Co Limited
6 MWBuilt Hatfield GSP
National Grid (England & Wales)
PeakGen BEGA - Haydock
Gas · Peak Gen Power Limited
6 MWBuilt Haydock GSP
National Grid (England & Wales)
PeakGen BEGA - Didcot
Gas · Peak Gen Power Limited
4 MWBuilt Didcot GSP
National Grid (England & Wales)
Bolney Grid Stability Services
Other · Wp Grid Services 13 Limited
0 MWScoping Bolney 400kV Substation
National Grid (England & Wales)
Oct 2031
Cilfynydd Grid Stability Services
Other · Cilfynydd Grid Services Limited
0 MWConsents Approved Cilfynydd 400kV Substation
National Grid (England & Wales)
Mar 2027
Cryogenic Battery System (Synchronous)
Battery storage · Cryobattery One Limited
0 MWUnder Construction/Commissioning Carrington 400KV Substation
National Grid (England & Wales)
May 2026
Dungeness B
Nuclear · EDF Energy Nuclear Generation Limited
0 MWBuilt Dungeness 275kV Substation
National Grid (England & Wales)
Eye Grid Services Facility
Other · Conrad (Eye) Limited
0 MWConsents Approved Yaxley 400kV Substation
National Grid (England & Wales)
Dec 2025
GF Upper Boat
Battery storage · Pulse Clean Energy Spv Franklin Limited
0 MWScoping Upper Boat 275kV Substation
National Grid (England & Wales)
May 2025
GF Upper Boat
Battery storage · Pulse Clean Energy Spv Franklin Limited
0 MWScoping Upper Boat 275kV Substation
National Grid (England & Wales)
Oct 2025
Lister Drive 275kV
Other · Lister Drive Solutions Limited
0 MWBuilt Lister Drive 275kV Substation
National Grid (England & Wales)
Mersey Reactive 1
Other · Mersey Reactive Power Limited
0 MWBuilt Frodsham (Network Rail) GSP
National Grid (England & Wales)
Necton Greener Grid Park
Battery storage · Necton Grid Solutions Limited
0 MWConsents Approved Necton 400kV Substation
National Grid (England & Wales)
Oct 2026
Ninfield Greener Grid Park
Battery storage · Ninfield Grid Solutions Limited
0 MWAwaiting Consents Ninfield 400kV Substation
National Grid (England & Wales)
Apr 2027
Rassau Stability Services Limited
Other · WP Grid Services 16 Limited
0 MWScoping Rassau 400kV Substation
National Grid (England & Wales)
Oct 2037
Sellindge Grid Stability Services
Other · Sellindge Grid Services Limited
0 MWConsents Approved Sellindge 400kV Substation
National Grid (England & Wales)
Aug 2026
Spennymoor Greener Grid Park
Battery storage · Spennymoor Grid Solutions Limited
0 MWAwaiting Consents Spennymoor 400kV Substation
National Grid (England & Wales)
Oct 2027
Swansea Greener Grid Park - Connection 2
Other · Swansea Grid Solutions Limited
0 MWConsents Approved Swansea North 400kV Substation
National Grid (England & Wales)
Jul 2025
Walpole Grid Services Facility
Other · Conrad (Walpole) Limited
0 MWConsents Approved Walpole 400kV Substation
National Grid (England & Wales)
Jul 2026
Page 27 of 27

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.