Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 19 of 46
ProjectCapacityStageConnection siteFrom
Mickleham Energy Storage
Battery storage · Bw Ess Development UK Limited
249 MWScoping Rowdown 400kV Substation
National Grid (England & Wales)
Oct 2031
Mosedale Energy
Battery storage · Mosedale Energy Limited
249 MWScoping High Marnham 400kV Substation
National Grid (England & Wales)
Oct 2033
Mwyndy Storage
Battery storage · Cenin Renewables Limited
249 MWScoping Aberthaw 275kV Substation
National Grid (England & Wales)
Oct 2037
Noventum - Biggleswade
Solar + storage · Noventum Power Solar 7 Limited
249 MWScoping Biggleswade 400kV Substation
National Grid (England & Wales)
Oct 2037
Noventum Market Harborough
Solar + storage · Noventum Power Solar 1 Limited
249 MWScoping West Anglia Connection Node F 400kV Substation
National Grid (England & Wales)
Oct 2034
Noventum Navenby
Solar + storage · Noventum Power Solar 4 Limited
249 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Ouse Energy Storage
Battery storage · Ouse Energy Limited
249 MWScoping Kemsley 400kV Substation
National Grid (England & Wales)
Oct 2027
Penn Battery Storage
Battery storage · Anglo Energy Storage Ltd
249 MWScoping Penn 275kV Substation
National Grid (England & Wales)
Jun 2033
Perry Barr BESS
Battery storage · Perry Barr Limited
249 MWScoping Warwickshire Connection Node F 400kV Substation
National Grid (England & Wales)
Oct 2037
Red House Farm - Friston 400kV 249MW connection
Battery storage · Cambridge Power Limited
249 MWScoping South Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Sheaf Energy
Battery storage · Sheaf Energy Limited
249 MWConsents Approved Richborough 400kV Substation
National Grid (England & Wales)
Apr 2025
Stracathro BESS
Battery storage · Opdenergy UK 8 Limited
249 MWScoping Stracathro BESS 275kV Substation
SSEN Transmission (north Scotland)
Jun 2032
Walham PV & BESS Sub
Solar + storage · Gloucester Energy Park Limited
249 MWScoping Walham 400kV Substation
National Grid (England & Wales)
Nov 2033
Wern Tarw Storage
Solar + storage · Cenin Renewables Limited
249 MWScoping South Wales East Connection Node B 400kV
National Grid (England & Wales)
Oct 2037
Whitehouse BESS station
Battery storage · Igp International Prospecting Limited
249 MWScoping Whitehouse 275kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Lan Fawr Energy Park
Onshore wind · Lan Fawr Energy Park Limited
246 MWScoping Pont Abraham GSP
National Grid (England & Wales)
Sep 2028
Peterborough
Gas · River Nene Power Limited
245 MWBuilt Walpole 132kV Substation
National Grid (England & Wales)
Aberthaw BESS
Battery storage · Rewe 7 Limited
240 MWScoping Aberthaw B 275/132kV Substation
National Grid (England & Wales)
Oct 2037
Apley Head Farm
Solar + storage · Queequeg Renewables Ltd
240 MWScoping Trent Valley South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Bearsden BESS
Battery storage · Bearsden BESS Ltd
240 MWScoping Bearsden BESS 275Kv Substation
SP Transmission (south Scotland)
Oct 2033
Beddington 1 BESS
Battery storage · Bluestone Beddington 1 Ltd
240 MWScoping London South Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2037
Beddington 2 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping London South Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2037
Burdiehouse BESS
Battery storage · IBV Burdiehouse Energy Park Limited
240 MWScoping Shawfair 400Kv Substation
SP Transmission (south Scotland)
Apr 2034
Butlers Wood PV & BESS Station
Solar + storage · Ib Vogt UK Ltd
240 MWScoping South Anglia Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Butt Lane - Grimsby BESS
Battery storage · Bluestone Butt Lane 1 Ltd
240 MWScoping SOUTH HUMBER CONNECTION NODE A 132kV
National Grid (England & Wales)
Oct 2035
Catsfield
Battery storage · MAS 001 Limited
240 MWScoping Ninfield GSP
National Grid (England & Wales)
Nov 2037
Chessington Estate
Battery storage · Chessington BESS Ltd
240 MWScoping Chessington 132kV
National Grid (England & Wales)
Nov 2037
Cilfynydd 2
Battery storage · Rewe 8 Limited
240 MWScoping Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2037
Coddington
Battery storage · Starlight Energy UK Limited
240 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Crawcroft Lane Solar and Storage
Solar + storage · Bsr Applications Limited
240 MWScoping South Humber Connection Node A 400kV
National Grid (England & Wales)
Oct 2039
CRT Keadby 2
Battery storage · Bluestone Energy Ltd
240 MWScoping Trent Valley North Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2039
Drakelow Power Station 1 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping Derbyshire Connection Node E 132Kv Substation
National Grid (England & Wales)
Oct 2034
Drakelow Power Station 2 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping Derbyshire Connection Node E 132 kV Substation
National Grid (England & Wales)
Oct 2037
Drakelow Power Station 3 BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping ERBYSHIRE CONNECTION NODE E 132kV SUBSTATION
National Grid (England & Wales)
Oct 2037
Drakelow Power Station 4
Battery storage · Bluestone Energy Ltd
240 MWScoping Derbyshire Connection Node E 132 kV Substation
National Grid (England & Wales)
Oct 2037
Essendine
Solar · Mallard Pass Solar Farm Limited
240 MWConsents Approved Ryhall 400kV Substation
National Grid (England & Wales)
Jan 2028
Fairmead and Yewtree Farm
Battery storage · Qair Renewables UK Limited
240 MWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Forepower Lincoln (250) Ltd
Battery storage · Forefuture Energy Ltd
240 MWScoping Navenby 132kV Substation
National Grid (England & Wales)
Oct 2034
Glen Ullinish Extension
Onshore wind · Glen Ullinish Wf 2 Ltd
240 MWAwaiting Consents Glen Ullinish Extension 132/33kV Substation
SSEN Transmission (north Scotland)
Nov 2031
Gresham House Cockenzie BESS
Battery storage · Cockenzie Storage Limited
240 MWUnder Construction/Commissioning Meadowmill 400/132kV Substation
SP Transmission (south Scotland)
Jul 2027
Grindon Grange
Solar + storage · Starlight Energy UK Limited
240 MWScoping Norton East 400kV Substation
National Grid (England & Wales)
Oct 2035
Grovers Farm BESS
Battery storage · Bluestone Energy Ltd
240 MWScoping West London Connection Node B 132kV substation
National Grid (England & Wales)
Oct 2037
Henley Downs Farm BESS
Battery storage · Ninfield BESS Ltd
240 MWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2037
High Bardrain Wood & Moor
Battery storage · Bluestone Energy Ltd
240 MWScoping High Bardrain Wood & Moor 132Kv Substation
SP Transmission (south Scotland)
Oct 2033
Hill Farm
Battery storage · Qair Renewables UK Limited
240 MWScoping Capenhurst GSP
National Grid (England & Wales)
Oct 2037
Hipsey BESS
Battery storage · Kona Asset 2 Limited
240 MWScoping Dunstable 400kV Substation
National Grid (England & Wales)
Oct 2032
Housham PV & BESS
Solar + storage · Fosse Green Energy Limited
240 MWScoping Navenby 400kV Substation
National Grid (England & Wales)
May 2033
Huntington Solar PV
Solar · Edf Energy Renewables Limited
240 MWScoping West Anglia Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
Intwood Farm BESS
Battery storage · Intwood BESS Ltd
240 MWScoping North Anglia Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2034
Kinder PV & BESS Station
Solar + storage · Ibv Danethorpe Lane Solar Limited
240 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2039
Page 19 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.