Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Mickleham Energy Storage Battery storage · Bw Ess Development UK Limited |
249 MW | Scoping |
| Mosedale Energy Battery storage · Mosedale Energy Limited |
249 MW | Scoping |
| Mwyndy Storage Battery storage · Cenin Renewables Limited |
249 MW | Scoping |
| Noventum - Biggleswade Solar + storage · Noventum Power Solar 7 Limited |
249 MW | Scoping |
| Noventum Market Harborough Solar + storage · Noventum Power Solar 1 Limited |
249 MW | Scoping |
| Noventum Navenby Solar + storage · Noventum Power Solar 4 Limited |
249 MW | Scoping |
| Ouse Energy Storage Battery storage · Ouse Energy Limited |
249 MW | Scoping |
| Penn Battery Storage Battery storage · Anglo Energy Storage Ltd |
249 MW | Scoping |
| Perry Barr BESS Battery storage · Perry Barr Limited |
249 MW | Scoping |
| Red House Farm - Friston 400kV 249MW connection Battery storage · Cambridge Power Limited |
249 MW | Scoping |
| Sheaf Energy Battery storage · Sheaf Energy Limited |
249 MW | Consents Approved |
| Stracathro BESS Battery storage · Opdenergy UK 8 Limited |
249 MW | Scoping |
| Walham PV & BESS Sub Solar + storage · Gloucester Energy Park Limited |
249 MW | Scoping |
| Wern Tarw Storage Solar + storage · Cenin Renewables Limited |
249 MW | Scoping |
| Whitehouse BESS station Battery storage · Igp International Prospecting Limited |
249 MW | Scoping |
| Lan Fawr Energy Park Onshore wind · Lan Fawr Energy Park Limited |
246 MW | Scoping |
| Peterborough Gas · River Nene Power Limited |
245 MW | |
| Aberthaw BESS Battery storage · Rewe 7 Limited |
240 MW | Scoping |
| Apley Head Farm Solar + storage · Queequeg Renewables Ltd |
240 MW | Scoping |
| Bearsden BESS Battery storage · Bearsden BESS Ltd |
240 MW | Scoping |
| Beddington 1 BESS Battery storage · Bluestone Beddington 1 Ltd |
240 MW | Scoping |
| Beddington 2 BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Burdiehouse BESS Battery storage · IBV Burdiehouse Energy Park Limited |
240 MW | Scoping |
| Butlers Wood PV & BESS Station Solar + storage · Ib Vogt UK Ltd |
240 MW | Scoping |
| Butt Lane - Grimsby BESS Battery storage · Bluestone Butt Lane 1 Ltd |
240 MW | Scoping |
| Catsfield Battery storage · MAS 001 Limited |
240 MW | Scoping |
| Chessington Estate Battery storage · Chessington BESS Ltd |
240 MW | Scoping |
| Cilfynydd 2 Battery storage · Rewe 8 Limited |
240 MW | Scoping |
| Coddington Battery storage · Starlight Energy UK Limited |
240 MW | Scoping |
| Crawcroft Lane Solar and Storage Solar + storage · Bsr Applications Limited |
240 MW | Scoping |
| CRT Keadby 2 Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Drakelow Power Station 1 BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Drakelow Power Station 2 BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Drakelow Power Station 3 BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Drakelow Power Station 4 Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Essendine Solar · Mallard Pass Solar Farm Limited |
240 MW | Consents Approved |
| Fairmead and Yewtree Farm Battery storage · Qair Renewables UK Limited |
240 MW | Scoping |
| Forepower Lincoln (250) Ltd Battery storage · Forefuture Energy Ltd |
240 MW | Scoping |
| Glen Ullinish Extension Onshore wind · Glen Ullinish Wf 2 Ltd |
240 MW | Awaiting Consents |
| Gresham House Cockenzie BESS Battery storage · Cockenzie Storage Limited |
240 MW | Under Construction/Commissioning |
| Grindon Grange Solar + storage · Starlight Energy UK Limited |
240 MW | Scoping |
| Grovers Farm BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Henley Downs Farm BESS Battery storage · Ninfield BESS Ltd |
240 MW | Scoping |
| High Bardrain Wood & Moor Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Hill Farm Battery storage · Qair Renewables UK Limited |
240 MW | Scoping |
| Hipsey BESS Battery storage · Kona Asset 2 Limited |
240 MW | Scoping |
| Housham PV & BESS Solar + storage · Fosse Green Energy Limited |
240 MW | Scoping |
| Huntington Solar PV Solar · Edf Energy Renewables Limited |
240 MW | Scoping |
| Intwood Farm BESS Battery storage · Intwood BESS Ltd |
240 MW | Scoping |
| Kinder PV & BESS Station Solar + storage · Ibv Danethorpe Lane Solar Limited |
240 MW | Scoping |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.