BATTERY STORAGE Β· SPP

Battery storage project GEN-2022-165, Swisher County

Battery storage project GEN-2022-165, Swisher County is a 200 MW battery storage request withdrawn in the SPP interconnection queue, in Swisher County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2023 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-165
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Kress 115 kV Substation
Location
Swisher County, Texas
Technology
Battery: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
26 February 2023
Proposed online date
June 2026
Withdrawn
November 2023

Location

Marker shows the centre of Swisher County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Swisher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem