Onshore wind project GEN-2016-002, Swisher County

Onshore wind project GEN-2016-002, Swisher County is a 74.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Swisher County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandonedMar 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-002
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Happy 115 kV Sub
Location
Swisher County, Texas
Technology
Wind: 74.0 MW
Total requested
74.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
4 March 2016
Proposed online date
December 2018
Withdrawn
March 2017

Location

Marker shows the centre of Swisher County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Swisher County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem