United States βΊ Grid βΊ Interconnection queues βΊ Virginia
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Virginia (2019 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Cvow 2, Oss 2 βΓΓ¬ T2G07 Offshore wind Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
836 MW | In study |
| Cvow 1, Oss 1 - T1L11 Offshore wind Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
833 MW | In study |
| Cvow 3, Oss 3 βΓΓ¬ T3G15 Offshore wind Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
820 MW | In study |
| Chesterfield CT Units 3&4 Gas |
569 MW | Agreement signed |
| Chesterfield CT Units 1 and 2 Gas Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
569 MW | In study |
| Randolph Solar Solar Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
500 MW | Agreement signed |
| Cassius Blue Solar Solar + storage |
300 MW | Agreement signed |
| Axton Solar Solar |
201 MW | Paused / redesign |
| Prospect Power Battery storage |
200 MW | Agreement signed |
| Big Pine Solar Solar |
150 MW | Agreement signed |
| Enclave Solar Energy Center Solar |
149 MW | Paused / redesign |
| Woodridge Solar Solar |
138 MW | Agreement signed |
| Southern Virginia Solar Solar |
125 MW | Agreement signed |
| Hillandale Solar Solar Β· Hillandale Solar, LLC |
102 MW | Agreement signed |
| Gibson Solar I Solar |
100 MW | Agreement signed |
| Harwood Power Battery storage |
100 MW | Agreement signed |
| Blue Rock Solar Solar |
100 MW | Agreement signed |
| Yadkins Energy Center Battery storage Β· Yadkins Energy Center, LLC |
100 MW | In study |
| Dulles Solar and BESS Solar |
100 MW | Agreement signed |
| Cassius Blue Solar Solar + storage |
94.0 MW | Agreement signed |
| Rocky Ford Solar Energy Center Solar |
90.0 MW | Paused / redesign |
| Pigeon Run Solar and Storage Solar Β· Pigeon Run Solar, LLC |
60.0 MW | Agreement signed |
| Gladys Solar Solar Β· Gladys Solar, LLC |
53.0 MW | Agreement signed |
| Wythe County Solar Project Battery storage |
52.2 MW | Agreement signed |
| Henry County Solar Facility Solar |
50.0 MW | Agreement signed |
| Switchgrass Solar 1 Solar |
49.0 MW | Paused / redesign |
| Waller Solar I Solar |
45.0 MW | Agreement signed |
| Amelia Energy Facility Solar Β· Amelia Energy Facility, LLC |
41.0 MW | In study |
| Drake Storage Battery storage |
40.0 MW | Agreement signed |
| Drake Storage Battery storage |
40.0 MW | Agreement signed |
| Chester Solar Technology Park Solar |
20.0 MW | Agreement signed |
| Knoxville Solar Solar |
20.0 MW | Agreement signed |
| Knoxville Solar Solar |
20.0 MW | Agreement signed |
| Harrowgate 1 Solar |
20.0 MW | Agreement signed |
| Walnut Solar I Solar |
19.9 MW | Agreement signed |
| Shands Energy Center Battery storage |
15.7 MW | Agreement signed |
| Jarratt Solar Solar |
14.9 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)