πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Virginia (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown376,737 MW
Active in queue6,737 MW37 requests
Agreement signed3,049 MW27 requests
Withdrawn617,607 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

37 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Cvow 2, Oss 2 β€šΓ„Γ¬ T2G07
Offshore wind Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
836 MWIn study City Of Chesapeake, VAPJM Sep 2019target 2032
Cvow 1, Oss 1 - T1L11
Offshore wind Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
833 MWIn study City Of Chesapeake, VAPJM Sep 2019target 2032
Cvow 3, Oss 3 β€šΓ„Γ¬ T3G15
Offshore wind Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
820 MWIn study City Of Chesapeake, VAPJM Sep 2019target 2032
Chesterfield CT Units 3&4
Gas
569 MWAgreement signed Chesterfield, VAPJM Sep 2019target 2029
Chesterfield CT Units 1 and 2
Gas Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
569 MWIn study Chesterfield, VAPJM Sep 2019target 2029
Randolph Solar
Solar Β· Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
500 MWAgreement signed Halifax, VAPJM Dec 2019target 2032
Cassius Blue Solar
Solar + storage
300 MWAgreement signed Sussex, VAPJM Feb 2019target 2031
Axton Solar
Solar
201 MWPaused / redesign Henry, VAPJM Mar 2019target 2025
Prospect Power
Battery storage
200 MWAgreement signed Rockingham, VAPJM May 2019target 2026
Big Pine Solar
Solar
150 MWAgreement signed Sussex, VAPJM Feb 2019target 2031
Enclave Solar Energy Center
Solar
149 MWPaused / redesign Sussex, VAPJM Jan 2019target 2027
Woodridge Solar
Solar
138 MWAgreement signed Albemarle, VAPJM Feb 2019target 2027
Southern Virginia Solar
Solar
125 MWAgreement signed Pittsylvania, VAPJM Jul 2019target 2027
Hillandale Solar
Solar Β· Hillandale Solar, LLC
102 MWAgreement signed Pittsylvania, VAPJM Mar 2019target 2030
Gibson Solar I
Solar
100 MWAgreement signed King George, VAPJM Sep 2019target 2027
Harwood Power
Battery storage
100 MWAgreement signed King George, VAPJM Oct 2019target 2029
Blue Rock Solar
Solar
100 MWAgreement signed Buckingham, VAPJM Mar 2019target 2026
Yadkins Energy Center
Battery storage Β· Yadkins Energy Center, LLC
100 MWIn study City Of Chesapeake, VAPJM Mar 2019target 2021
Dulles Solar and BESS
Solar
100 MWAgreement signed Loudoun, VAPJM Sep 2019target 2026
Cassius Blue Solar
Solar + storage
94.0 MWAgreement signed Sussex, VAPJM Aug 2019target 2031
Rocky Ford Solar Energy Center
Solar
90.0 MWPaused / redesign Henry, VAPJM Mar 2019target 2026
Pigeon Run Solar and Storage
Solar Β· Pigeon Run Solar, LLC
60.0 MWAgreement signed Campbell, VAPJM Mar 2019target 2031
Gladys Solar
Solar Β· Gladys Solar, LLC
53.0 MWAgreement signed Campbell, VAPJM Mar 2019target 2031
Wythe County Solar Project
Battery storage
52.2 MWAgreement signed Wythe, VAPJM Mar 2019target 2027
Henry County Solar Facility
Solar
50.0 MWAgreement signed Henry, VAPJM Jan 2019target 2027
Switchgrass Solar 1
Solar
49.0 MWPaused / redesign Accomack, VAPJM Mar 2019target 2025
Waller Solar I
Solar
45.0 MWAgreement signed Lancaster, VAPJM Jun 2019target 2027
Amelia Energy Facility
Solar Β· Amelia Energy Facility, LLC
41.0 MWIn study Amelia, VAPJM Sep 2019target 2022
Drake Storage
Battery storage
40.0 MWAgreement signed Middlesex, VAPJM Jan 2019target 2026
Drake Storage
Battery storage
40.0 MWAgreement signed Middlesex, VAPJM Apr 2019target 2026
Chester Solar Technology Park
Solar
20.0 MWAgreement signed Chesterfield, VAPJM Sep 2019target 2027
Knoxville Solar
Solar
20.0 MWAgreement signed Isle Of Wight, VAPJM Apr 2019target 2027
Knoxville Solar
Solar
20.0 MWAgreement signed Isle Of Wight, VAPJM Mar 2019target 2027
Harrowgate 1
Solar
20.0 MWAgreement signed Chesterfield, VAPJM Mar 2019target 2027
Walnut Solar I
Solar
19.9 MWAgreement signed King And Queen, VAPJM Apr 2019target 2026
Shands Energy Center
Battery storage
15.7 MWAgreement signed Sussex, VAPJM Jan 2019target 2025
Jarratt Solar
Solar
14.9 MWAgreement signed Greensville, VAPJM Sep 2019target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)