United States › Grid › Interconnection queues › Virginia
SOLAR · PJMChester Solar Technology Park
Chester Solar Technology Park is a 20.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Chesterfield County, Virginia, connecting to Dominion.
Queue statusConsented
- PlanningQueued Sep 2019 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Jun 2027 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AF1-291
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Tyler 34.5 kV
- Location
- Chesterfield County, Virginia
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Active
- Entered queue
- 30 September 2019
- Proposed online date
- June 2027
Location
Marker shows the centre of Chesterfield County; the queue data does not give exact sites.
Other requests in Chesterfield County
- Chesterfield CT Units 3&4Gas · 569 MW · agreement signed
- Chester SolarSolar · 120 MW · agreement signed
- Winterpock ISolar · 20.0 MW · agreement signed
- Harrowgate 1Solar · 20.0 MW · agreement signed
- Chesterfield CT Units 1 and 2Gas · 569 MW · in study
- Battery storage project AG2-088, Chesterfield CountyBattery storage · 150 MW · in study
- Battery storage project AG2-384, Chesterfield CountyBattery storage · 60.8 MW · in study
- 360 Solar Center, LLCSolar · 26.0 MW · in study
- 360 Solar Center, LLCSolar · 26.0 MW · in study
- Chesterfield Unit #6Coal · 27.0 MW · built
- Dry Bridge Energy CenterBattery storage · 20.0 MW · built
- Chesterfield Unit #5Coal · 20.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem