United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMBattery storage project AG2-088, Chesterfield County
Battery storage project AG2-088, Chesterfield County is a 150 MW battery storage request in interconnection study in the PJM interconnection queue, in Chesterfield County, Virginia, connecting to Dominion.
- PlanningQueued Feb 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2022 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AG2-088
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Hermon Energy Center, LLC
- Connection point (POI)
- Midlothian 230 kV
- Location
- Chesterfield County, Virginia
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 5 February 2025
- Proposed online date
- April 2022
Location
Marker shows the centre of Chesterfield County; the queue data does not give exact sites.
Other requests in Chesterfield County
- Chesterfield CT Units 3&4Gas · 569 MW · agreement signed
- Chester SolarSolar · 120 MW · agreement signed
- Chester Solar Technology ParkSolar · 20.0 MW · agreement signed
- Winterpock ISolar · 20.0 MW · agreement signed
- Harrowgate 1Solar · 20.0 MW · agreement signed
- Chesterfield CT Units 1 and 2Gas · 569 MW · in study
- Battery storage project AG2-384, Chesterfield CountyBattery storage · 60.8 MW · in study
- 360 Solar Center, LLCSolar · 26.0 MW · in study
- 360 Solar Center, LLCSolar · 26.0 MW · in study
- Chesterfield Unit #6Coal · 27.0 MW · built
- Dry Bridge Energy CenterBattery storage · 20.0 MW · built
- Chesterfield Unit #5Coal · 20.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem