🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Virginia

COAL · PJM

Chesterfield Unit #5

Chesterfield Unit #5 is a 20.0 MW coal request built and operating in the PJM interconnection queue, in Chesterfield County, Virginia, connecting to Dominion.

Queue statusOperating
  1. PlanningQueued Jul 2007 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2011 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
S80
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Chesterfield 230kV
Location
Chesterfield County, Virginia
Technology
Coal: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 July 2007
Proposed online date
June 2011
Came online
June 2011

Location

Marker shows the centre of Chesterfield County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Chesterfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem