SOLAR · PJM

Chester Solar

Chester Solar is a 120 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Chesterfield County, Virginia, connecting to Dominion.

Queue statusConsented
  1. PlanningQueued Dec 2018 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2027 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
AE2-027
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Harrowgate-Locks 115kV
Location
Chesterfield County, Virginia
Technology
Solar: 120 MW
Total requested
120 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Active
Entered queue
20 December 2018
Proposed online date
October 2027

Location

Marker shows the centre of Chesterfield County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Chesterfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem