Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 Gas |
1,166 MW | In study |
| Skylab Solar Solar · EDF Renewables Development, Inc. |
610 MW | In study |
| Old Aqueduct Solar Solar + storage · Old Aqueduct Solar |
512 MW | In study |
| Tabor Solar Solar · Quanah Solar LLC |
506 MW | In study |
| Frye Storage Solar + storage · Hecate Energy Frye Storage LLC |
504 MW | In study |
| Pinnington Storage Solar + storage · Hecate Energy Longhorn Storage LLC |
503 MW | In study |
| Dragan Storage Solar + storage · Hecate Grid Dragan Storage LLC |
408 MW | In study |
| Onshore wind project GEN-2020-067, Terry County Onshore wind |
353 MW | In study |
| Mensa BESS Battery storage · BRP Mensa BESS LLC |
307 MW | In study |
| Old Aqueduct Batt Solar + storage · Old Aqueduct LLC |
303 MW | In study |
| Brantley Branch Batt Battery storage · Brantley Branch LLC |
302 MW | In study |
| BRP Passu BESS Battery storage · BRP Passu BESS LLC |
302 MW | In study |
| Crater BESS Battery storage · BRP Crater BESS LLC |
302 MW | In study |
| Quela BESS Battery storage · BRP Quela BESS LLC |
301 MW | In study |
| Sandow Solar Solar · Sandow Lakes Ranch Solar I, LLC |
287 MW | In study |
| Sierra Madre Solar Solar · Sierra Madre Solar LLC |
255 MW | In study |
| Pandora Solar Solar |
252 MW | Paused / redesign |
| Cantaloupe Storage Battery storage |
251 MW | Paused / redesign |
| Iguala Solar Solar |
250 MW | Paused / redesign |
| Razorbill Solar Solar + storage · RWE Solar Development, LLC |
240 MW | In study |
| Pluto Solar Solar |
228 MW | Paused / redesign |
| Maratua Solar Solar · BDPU Solar Maratua, LLC |
217 MW | Paused / redesign |
| Alamosa Solar Solar |
210 MW | Paused / redesign |
| Val Vista Grid BESS 1 Battery storage · Val Vista Grid, LLC |
209 MW | In study |
| BRP Rhine BESS Battery storage · BRP Rhine BESS LLC |
207 MW | In study |
| BRP Volans BESS Battery storage · BRP Volans BESS LLC |
207 MW | In study |
| BRP Pyxis BESS Battery storage · BRP Pyxis BESS LLC |
207 MW | In study |
| Sepik BESS Battery storage · BRP Sepik BESS LLC |
205 MW | In study |
| Kinenos Solar Solar · Encino del Sol Energy, LLC |
203 MW | In study |
| Loma Pinta Solar Solar · Loma Pinta Wind Energy, LLC |
203 MW | In study |
| BRP Kabru BESS Battery storage · BRP Kabru BESS LLC |
203 MW | In study |
| BRP Kamet BESS Battery storage · BRP Kamet BESS LLC |
203 MW | In study |
| BRP Perseus BESS Battery storage · BRP Perseus BESS LLC |
203 MW | In study |
| Nockenut Springs Solar 3 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| BRP Pictor BESS Battery storage · BRP Pictor BESS LLC |
201 MW | In study |
| Morrow Lake Storage Solar + storage · Morrow Lake Storage, LLC |
201 MW | In study |
| Elbus BESS Battery storage · BRP Elbus BESS LLC |
201 MW | In study |
| Stem Solar Solar · Innovative Solar 134, LLC |
200 MW | In study |
| Battery storage project GEN-2020-060, Lubbock County Battery storage |
200 MW | In study |
| Accalia Point Solar Solar · Accalia Point Solar LLC |
191 MW | In study |
| Lan Solar SLF Solar + storage · BR Solar, LLC |
182 MW | In study |
| Creekfield Solar Solar |
161 MW | Paused / redesign |
| Noria Solar DCC Solar |
145 MW | Paused / redesign |
| BRP Octans BESS Battery storage · BRP OCTANS BESS LLC |
130 MW | In study |
| BRP Ampato BESS Battery storage · BRP Ampato BESS LLC |
122 MW | In study |
| Kalina Solar Solar · Aurora Solar LLC |
120 MW | In study |
| Razorbill Storage Solar + storage · RWE Solar Development, LLC |
120 MW | In study |
| Atria Solar Solar · Atria Energy Project, LLC |
112 MW | In study |
| McClure Solar Solar · McClure Solar LLC |
106 MW | In study |
| Estonian Storage Other · 249RD 8ME |
103 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)