Withdrawn queue requests in Michigan (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown293,737 MW
Active in queue3,078 MW24 requests
Agreement signed1,568 MW14 requests
Withdrawn293,737 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

29 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J1459, Calhoun County
Gas
670 MWWithdrawn / abandoned Calhoun, MIMISO Apr 2019target 2024
Gas project J1346, Wayne County
Gas
382 MWWithdrawn / abandoned Wayne, MIMISO Apr 2019target 2022
Solar project J1403, Ionia County
Solar
200 MWWithdrawn / abandoned Ionia, MIMISO Apr 2019target 2023
Solar project J1322, Eaton County
Solar
200 MWWithdrawn / abandoned Eaton, MIMISO Apr 2019target 2022
Solar + storage project AE2-266, St. Joseph County
Solar + storage
199 MWWithdrawn / abandoned St. Joseph, MIPJM Mar 2019target 2021
Solar project J1237, Washtenaw County
Solar
175 MWWithdrawn / abandoned Washtenaw, MIMISO Apr 2019target 2022
Onshore wind project J1195, Branch County
Onshore wind
150 MWWithdrawn / abandoned Branch, MIMISO Apr 2019target 2021
Solar project J1362, Muskegon County
Solar
150 MWWithdrawn / abandoned Muskegon, MIMISO Apr 2019target 2021
Solar + storage project AE2-265, St. Joseph County
Solar + storage
150 MWWithdrawn / abandoned St. Joseph, MIPJM Mar 2019target 2021
Solar project J1394, Shiawassee County
Solar
150 MWWithdrawn / abandoned Shiawassee, MIMISO Apr 2019target 2021
Solar project J1307, Eaton County
Solar
150 MWWithdrawn / abandoned Eaton, MIMISO Apr 2019target 2022
Solar project J1350, Monroe County
Solar
150 MWWithdrawn / abandoned Monroe, MIMISO Apr 2019target 2025
Onshore wind project J1317, Sanilac County
Onshore wind
150 MWWithdrawn / abandoned Sanilac, MIMISO Apr 2019target 2022
Solar project J1256, Washtenaw County
Solar
150 MWWithdrawn / abandoned Washtenaw, MIMISO Apr 2019target 2022
Solar project J1423, Ottawa County
Solar
100 MWWithdrawn / abandoned Ottawa, MIMISO Apr 2019target 2022
Solar project J1449, Monroe County
Solar
100 MWWithdrawn / abandoned Monroe, MIMISO Apr 2019target 2022
Battery storage project AE2-284, Cass County
Battery storage
75.0 MWWithdrawn / abandoned Cass, MIPJM Mar 2019target 2022
Southwest Michigan Energy Center
Battery storage Β· Southwest Michigan Solar Project, LLC
52.2 MWWithdrawn / abandoned Van Buren, MIPJM Mar 2019target 2022
Solar project J1211, Isabella County
Solar
50.0 MWWithdrawn / abandoned Isabella, MIMISO Apr 2019target 2023
Gas project J1370, Chippewa County
Gas
50.0 MWWithdrawn / abandoned Chippewa, MIMISO Apr 2019target 2021
Gas project J1206, Branch County
Gas
50.0 MWWithdrawn / abandoned Branch, MIMISO Apr 2019target 2021
Gas project J1207, Branch County
Gas
50.0 MWWithdrawn / abandoned Branch, MIMISO Apr 2019target 2021
Onshore wind project J1244, Houghton County
Onshore wind
38.4 MWWithdrawn / abandoned Houghton, MIMISO Apr 2019target 2021
Solar project J1192, Eaton County
Solar
35.0 MWWithdrawn / abandoned Eaton, MIMISO Mar 2019target 2024
Onshore wind project J1406, Muskegon County
Onshore wind
25.2 MWWithdrawn / abandoned Muskegon, MIMISO Apr 2019target 2021
Battery storage project J1451, Washtenaw County
Battery storage
25.0 MWWithdrawn / abandoned Washtenaw, MIMISO Apr 2019target 2022
Battery storage project J1252, Marquette County
Battery storage
20.0 MWWithdrawn / abandoned Marquette, MIMISO Apr 2019target 2022
Battery storage project J1327, Ionia County
Battery storage
20.0 MWWithdrawn / abandoned Ionia, MIMISO Apr 2019target 2022
Gas project J1264, Schoolcraft County
Gas
20.0 MWWithdrawn / abandoned Schoolcraft, MIMISO Apr 2019target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)