United States βΊ Grid βΊ Interconnection queues βΊ Michigan
GAS Β· MISOGas project J1206, Branch County
Gas project J1206, Branch County is a 50.0 MW gas request withdrawn in the MISO interconnection queue, in Branch County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedFeb 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1206
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Newton 138kV Substation
- Location
- Branch County, Michigan
- Technology
- Gas: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA Complete; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 26 April 2019
- Proposed online date
- April 2021
- Withdrawn
- February 2021
Location
Marker shows the centre of Branch County; the queue data does not give exact sites.
Other requests in Branch County
- Solar project J1550, Branch CountySolar Β· 200 MW Β· agreement signed
- Solar project J1320, Branch CountySolar Β· 150 MW Β· agreement signed
- Battery storage project J1635, Branch CountyBattery storage Β· 100 MW Β· agreement signed
- Gas project J3922, Branch CountyGas Β· 1,445 MW Β· in study
- Solar project J3859, Branch CountySolar Β· 200 MW Β· in study
- Battery storage project J4123, Branch CountyBattery storage Β· 200 MW Β· in study
- Solar project J3471, Branch CountySolar Β· 150 MW Β· in study
- Surplus; J1320Other Β· 150 MW Β· in study
- Battery storage project J3973, Branch CountyBattery storage Β· 100 MW Β· in study
- Solar project J1916, Branch CountySolar Β· 100 MW Β· in study
- Battery storage project J3861, Branch CountyBattery storage Β· 100 MW Β· in study
- Battery storage project J3924, Branch CountyBattery storage Β· 80.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem