BATTERY STORAGE · PJM

Southwest Michigan Energy Center

Southwest Michigan Energy Center is a 52.2 MW battery storage request withdrawn in the PJM interconnection queue, in Van Buren County, Michigan, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedJan 2026 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE2-325
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Southwest Michigan Solar Project, LLC
Connection point (POI)
Valley 138 kV
Location
Van Buren County, Michigan
Technology
Battery: 52.2 MW
Total requested
52.2 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
Queue status
Withdrawn
Entered queue
30 March 2019
Proposed online date
December 2022
Withdrawn
January 2026

Location

Marker shows the centre of Van Buren County; the queue data does not give exact sites.

Power plants in Michigan · Transmission lines in Michigan

Other requests in Van Buren County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem