Gas project J1207, Branch County

Gas project J1207, Branch County is a 50.0 MW gas request withdrawn in the MISO interconnection queue, in Branch County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. ConsentedAug 2022 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1207
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Newton 138kV Substation
Location
Branch County, Michigan
Technology
Gas: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA Complete; Post GIA Status: Withdrawn
Queue status
Withdrawn
Entered queue
26 April 2019
Agreement signed
17 August 2022
Proposed online date
April 2021
Withdrawn
December 2022

Location

Marker shows the centre of Branch County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Branch County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem