United States โบ Grid โบ Interconnection queues โบ Massachusetts
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in Massachusetts (2022 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore Wind Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
1,200 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
470 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
315 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
293 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
275 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
270 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
257 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
206 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
158 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
155 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
130 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
130 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
119 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
117 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
95.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
18.9 MW | Withdrawn / abandoned |
| Group @ Hatchville 936 - EMA ASO Solar + storage |
18.5 MW | Withdrawn / abandoned |
| Group @ Medway 65 - EMA ASO Solar + storage |
17.5 MW | Withdrawn / abandoned |
| Group @ Industrial Park 636 - EMA ASO Solar + storage |
16.5 MW | Withdrawn / abandoned |
| Group @ Wing Lane 624 - EMA ASO Solar + storage |
15.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
11.9 MW | Withdrawn / abandoned |
| Group @ Orleans 975 - EMA ASO Solar + storage |
10.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
10.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
10.0 MW | Withdrawn / abandoned |
| Group @ Montigue - WMA ASO Solar + storage |
9.9 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
9.1 MW | Withdrawn / abandoned |
| Group @ French King - WMA ASO Solar + storage |
8.9 MW | Withdrawn / abandoned |
| Group @ Maynard 416 - EMA ASO Solar + storage |
8.5 MW | Withdrawn / abandoned |
| Group @ Berkshire 18C Solar + storage |
7.7 MW | Withdrawn / abandoned |
| Group @ Podick - WMA ASO Solar + storage |
7.7 MW | Withdrawn / abandoned |
| Group @ Blandford 19J - WMA ASO Solar + storage |
7.0 MW | Withdrawn / abandoned |
| Group @ West Pond 737 - EMA ASO Solar + storage |
7.0 MW | Withdrawn / abandoned |
| Uxbridge Substation โรรฌ NG Hopedale West Group Study Battery storage |
7.0 MW | Withdrawn / abandoned |
| Group @ Duxbury 738 - EMA ASO Solar + storage |
6.8 MW | Withdrawn / abandoned |
| Canton 470 - EMA ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Holliston 130 - EMA ASO Battery storage |
5.0 MW | Withdrawn / abandoned |
| Tremont 713 - EMA ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Cumberland 22B - WMA ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Hyannis 961 - EMA ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Uxbridge Substation โรรฌ NG Hopedale West Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Whitins Pond Substation โรรฌ NG Hopedale West Group Study Battery storage |
4.9 MW | Withdrawn / abandoned |
| Whitins Pond Substation โรรฌ NG Hopedale West Group Study Battery storage |
4.9 MW | Withdrawn / abandoned |
| Marshfield 739 - EMA ASO Solar + storage |
4.6 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)