United States › Grid › Interconnection queues › Massachusetts
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 18.9 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Hampshire County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2022 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1263
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- POI Coordinates: 42.42649, -72.53956, Feeder: 18G6, Express feeder, Owner of POI: WMECO (Eversource), Distribution Voltage Level: 13.8 kV, Substation Voltage Level: 115 kV - 13.8 kV
- Location
- Hampshire County, Massachusetts
- Technology
- Battery: 18.9 MW
- Total requested
- 18.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 1 July 2022
- Proposed online date
- October 2023
- Withdrawn
- July 2023
Location
Marker shows the centre of Hampshire County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Hampshire County
- Five Corners Substation - NG Western MA Area Cluster StudySolar · 3.0 MW · built
- Solar with battery additionSolar + storage · 1.3 MW · built
- Battery StorageBattery storage · 196 MW · withdrawn
- Battery StorageBattery storage · 151 MW · withdrawn
- SolarSolar · 40.0 MW · withdrawn
- EE Group @ BlandfordSolar + storage · 28.9 MW · withdrawn
- Battery StorageBattery storage · 20.0 MW · withdrawn
- Shutesbury substation - NG Western MA Area Cluster StudySolar · 20.0 MW · withdrawn
- Ware Substation - NG Western MA Area Cluster StudySolar · 13.3 MW · withdrawn
- Ware Substation - NG WMA Group 3Solar + storage · 11.0 MW · withdrawn
- Solar + Battery StorageSolar + storage · 10.0 MW · withdrawn
- Solar + Battery StorageSolar + storage · 3.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem