United States › Grid › Interconnection queues › Massachusetts
SOLAR + STORAGE · ISO-NESolar with battery addition
Solar with battery addition is a 1.3 MW solar + storage request built and operating in the ISO-NE interconnection queue, in Hampshire County, Massachusetts.
Request details
- Queue ID
- 768
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource Tillson Substation
- Location
- Hampshire County, Massachusetts
- Technology
- Solar: 1.3 MW · Battery
- Total requested
- 1.3 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 13 June 2018
- Proposed online date
- September 2019
Location
Marker shows the centre of Hampshire County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Hampshire County
- Five Corners Substation - NG Western MA Area Cluster StudySolar · 3.0 MW · built
- Battery StorageBattery storage · 196 MW · withdrawn
- Battery StorageBattery storage · 151 MW · withdrawn
- SolarSolar · 40.0 MW · withdrawn
- EE Group @ BlandfordSolar + storage · 28.9 MW · withdrawn
- Battery StorageBattery storage · 20.0 MW · withdrawn
- Shutesbury substation - NG Western MA Area Cluster StudySolar · 20.0 MW · withdrawn
- Battery StorageBattery storage · 18.9 MW · withdrawn
- Ware Substation - NG Western MA Area Cluster StudySolar · 13.3 MW · withdrawn
- Ware Substation - NG WMA Group 3Solar + storage · 11.0 MW · withdrawn
- Solar + Battery StorageSolar + storage · 10.0 MW · withdrawn
- Solar + Battery StorageSolar + storage · 3.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem