United States › Grid › Interconnection queues › Massachusetts

SOLAR + STORAGE · ISO-NE

Solar + Battery Storage

Solar + Battery Storage is a 10.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Hampshire County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedSep 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1152
Grid region
ISO-NE (New England)
Connection point (POI)
National Grid 13.8 kV 909W4
Location
Hampshire County, Massachusetts
Technology
Solar: 10.0 MW · Battery
Total requested
10.0 MW
Service type
Network resource (NRIS)
Study phase
Not Started
Queue status
Withdrawn
Entered queue
4 August 2021
Proposed online date
September 2022
Withdrawn
September 2022

Location

Marker shows the centre of Hampshire County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Hampshire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem