United States › Grid › Interconnection queues › Massachusetts
SOLAR + STORAGE · ISO-NEGroup @ Wing Lane 624 - EMA ASO
Group @ Wing Lane 624 - EMA ASO is a 15.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Bristol County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1290
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource Wing Lane 624
- Location
- Bristol County, Massachusetts
- Technology
- Solar: 15.0 MW · Battery
- Total requested
- 15.0 MW
- Queue status
- Withdrawn
- Entered queue
- 8 June 2022
- Proposed online date
- November 2023
- Withdrawn
- June 2025
Location
Marker shows the centre of Bristol County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Bristol County
- Battery StorageBattery storage · 350 MW · in study
- Battery StorageBattery storage · 168 MW · in study
- Brayton Point 3 Uprate( see 243)Coal · 30.0 MW · built
- Dartmouth Power ExpansionGas · 24.0 MW · built
- Increase to Steam Turbine Capacity Uprate (See QPCoal · 6.0 MW · built
- Dighton Power UprateGas · 5.0 MW · built
- SolarSolar · 1.9 MW · built
- Combined CycleGas · 550 MW · withdrawn
- Battery StorageBattery storage · 529 MW · withdrawn
- Battery StorageBattery storage · 293 MW · withdrawn
- Battery StorageBattery storage · 271 MW · withdrawn
- Battery StorageBattery storage · 257 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem