Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9614.5 GW
Active in queue46.5 GW204 requests
Agreement signed16.6 GW57 requests
Withdrawn510106.6 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

96 requests ยท page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Vogtle Unit 3
Nuclear
1,158 MWOperating Burke, GASoutheast Mar 20102024
Talbot County
Gas
726 MWOperating Talbot, GASoutheast Dec 2023
TA Smith (+50 MW)
Gas
664 MWOperating Whitfield, GASoutheast 2018
Other project 62, Whitfield County
Other
640 MWOperating Whitfield, GASoutheast Sep 1999
BC Smith
Gas
547 MWOperating Effingham, GASoutheast Sep 20232024
Effingham (aka McCall Road)
Gas
540 MWOperating Effingham, GASoutheast Dec 2023
Sewell Creek
Gas
518 MWOperating Polk, GASoutheast Dec 2023
Plant McDonough, Units 4A & 5A
Gas
506 MWOperating Cobb, GASoutheast 2023
Walton Bainbridge (aka E. Bainbr)
Gas
500 MWOperating Decatur, GASoutheast Dec 2023
Baconton
Gas
500 MWOperating Mitchell, GASoutheast Dec 2023
Plant McDonough, Units 4A & 5A
Gas
487 MWOperating Cobb, GASoutheast 2017
LGE Washington (aka Tiger Creek)
Gas
480 MWOperating Washington, GASoutheast Dec 2023
Hartwell Energy
Gas
354 MWOperating Hart, GASoutheast Dec 2023
Doyle
Gas
345 MWOperating Walton, GASoutheast Dec 2023
Wadley Solar
Other
260 MWOperating Jefferson, GASoutheast Jul 20202024
SR Toombs
Solar
250 MWOperating Toombs, GASoutheast Apr 2020target 2024
LGE Walton - Monroe
Gas
220 MWOperating Walton, GASoutheast Dec 2023
Smarr (aka Rumble Road)
Gas
218 MWOperating Monroe, GASoutheast Dec 2023
Cool Springs
Solar + storage
213 MWOperating Decatur, GASoutheast 2021
Decatur Solar
Solar
200 MWOperating Decatur, GASoutheast Aug 20182024
Twiggs Solar
Solar
200 MWOperating Twiggs, GASoutheast 2020
Hickory Part Solar & Battery
Solar + storage
196 MWOperating Mitchell, GASoutheast 2022
Wadley Solar
Solar
170 MWOperating Jefferson, GASoutheast Jul 20162024
Southern Oak Solar Energy Center Phase II
Solar
160 MWOperating Mitchell, GASoutheast 2020
Quitman II
Solar
150 MWOperating Brooks, GASoutheast 2021
Walton Discover (aka Goat Rock)
Gas
150 MWOperating Lee, GASoutheast Dec 2023
Washington County Solar
Solar
150 MWOperating Washington, GASoutheast Aug 20182024
Quitman Solar
Solar
150 MWOperating Brooks, GASoutheast 2019
Sandhills Solar Facility
Solar
143 MWOperating Taylor, GASoutheast 2017
SR DeSoto I
Solar
138 MWOperating Lee, GASoutheast Dec 20232022
Robins AFB Solar
Solar
128 MWOperating Houston, GASoutheast 2021
SR Clay
Solar
125 MWOperating Clay, GASoutheast Dec 20232022
Dougherty County Solar
Solar
120 MWOperating Dougherty, GASoutheast Dec 2023
SR Snipesville II
Solar
118 MWOperating Jeff Davis, GASoutheast Dec 2023
SR Arlington II
Solar
109 MWOperating Early, GASoutheast Dec 2023
SR Snipesville III
Solar
103 MWOperating Jeff Davis, GASoutheast Dec 20232023
Robins AFB Solar
Solar
101 MWOperating Houston, GASoutheast 2021
White Pine Solar
Solar
101 MWOperating Taylor, GASoutheast 2016
SR Lumpkin
Solar
100 MWOperating Stewart, GASoutheast Dec 2023
Hawk Road (aka Dynegy)
Gas
100 MWOperating Heard, GASoutheast Dec 2023
Sowega
Gas
100 MWOperating Mitchell, GASoutheast Dec 2023
Butler Solar
Solar
100 MWOperating Taylor, GASoutheast 2016
SR Snipesville I
Solar
90.0 MWOperating Jeff Davis, GASoutheast Dec 2023
SR Ailey
Solar
80.0 MWOperating Montgomery, GASoutheast Oct 2019target 2024
Southern Oak Solar Energy Center Phase I
Solar
80.0 MWOperating Mitchell, GASoutheast 2020
Blackwater Solar
Solar
80.0 MWOperating Ware, GASoutheast Oct 20182024
CPV Stagecoach Solar
Solar
80.0 MWOperating Macon, GASoutheast Jul 20202024
Lancaster Solar
Solar
80.0 MWOperating Calhoun, GASoutheast Dec 2023
Bull Dog Solar
Solar
80.0 MWOperating Warren, GASoutheast Dec 20182024
Decatur County Solar - Part II
Solar
79.9 MWOperating Decatur, GASoutheast 2015
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)