Withdrawn queue requests in California (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown21574.6 GW
Active in queue53.2 GW136 requests
Agreement signed31.6 GW64 requests
Withdrawn21574.6 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

215 requests ยท page 1 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Eternal 2
Other
2,851 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2031
Islay
Wind + storage
2,275 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2021target 2034
Empire
Battery storage
1,647 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2024
Salinan Energy
Wind + storage
1,509 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2021target 2032
Bravo Wind
Offshore wind
1,465 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2021target 2034
Colima Hybrid Solar
Solar + storage
1,212 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2026
Wingtip Solar 2
Solar + storage
1,123 MWWithdrawn / abandoned Merced, CACAISO Apr 2021target 2027
Red Star Grizzly Offshore Wind
Offshore wind
1,040 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2021target 2028
Water Canyon Wind
Onshore wind
1,029 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2021target 2028
Bellefield Solar 4
Solar + storage
1,017 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2025
Eolica De Rumorosa
Onshore wind
941 MWWithdrawn / abandoned Tecate Baja California Mexico, CACAISO Apr 2021target 2035
Three Rocks
Solar + storage
878 MWWithdrawn / abandoned CACAISO Apr 2021target 2024
Solar Farm Energy Center
Solar + storage
822 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2026
Hadselville
Solar + storage
816 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2021target 2025
Estanislau Solar Storage
Solar + storage
816 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2021target 2024
Yeager Mustang
Solar + storage
815 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2027
Muscat
Battery storage
772 MWWithdrawn / abandoned CACAISO Apr 2021target 2024
Sur Vista
Solar + storage
718 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Juglans Energy Storage
Battery storage
711 MWWithdrawn / abandoned Solano, CACAISO Apr 2021target 2031
Adastra Hybrid Solar
Solar + storage
709 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2025
Edison Drive Energy Storage
Battery storage
672 MWWithdrawn / abandoned Ventura, CACAISO Apr 2021target 2024
Huxley Solar
Solar + storage
671 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2027
Ashanti Hybrid Solar
Solar + storage
650 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2024
Seaglass Offshore Wind
Offshore wind
629 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2021target 2032
Natura
Other
623 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2025
Charger Storage
Battery storage
616 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2025
Blue Oak Storage
Battery storage
616 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2021target 2025
Resonate
Solar + storage
615 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2024
Osito Energy
Solar + storage
613 MWWithdrawn / abandoned Placer, CACAISO Apr 2021target 2024
Voltron
Solar + storage
612 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2024
Red Arch Hybrid Solar
Solar + storage
608 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2025
Europa Energy Center
Solar + storage
607 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2025
Fuerte Energy Storage
Battery storage
554 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2024
Appellation
Battery storage
515 MWWithdrawn / abandoned CACAISO Apr 2021target 2024
MT Baldy Energy Storage
Battery storage
513 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2031
Menilles
Solar + storage
511 MWWithdrawn / abandoned Fresno, CACAISO Apr 2021target 2024
Blythe BESS
Battery storage
510 MWWithdrawn / abandoned Riverside, CACAISO Mar 2021target 2022
Goodall Storage
Battery storage
510 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2023
Dolores
Battery storage
510 MWWithdrawn / abandoned San Clara, CACAISO Apr 2021target 2025
Winoka Hybrid Solar
Solar + storage
508 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Stirling Bridge
Solar + storage
507 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2021target 2031
Bison Peak
Battery storage
506 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2025
Ada Energy Storage
Battery storage
505 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2021target 2034
Spindle Energy Storage
Battery storage
504 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2024
Commander Energy Storage
Battery storage
504 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2021target 2032
Moonstone Energy Storage
Battery storage
504 MWWithdrawn / abandoned Alameda, CACAISO Apr 2021target 2024
Gwent Storage 2
Battery storage
473 MWWithdrawn / abandoned Ventura, CACAISO Apr 2021target 2033
Salvador
Solar + storage
470 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2030
Velas
Battery storage
463 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2021target 2031
Bull Run
Solar + storage
457 MWWithdrawn / abandoned Butte, CACAISO Apr 2021target 2030
Page 1 of 5

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)