United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in NYISO (New York) (2019 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Cider Solar Solar Β· Hecate Energy Cider Solar LLC |
500 MW | In study |
| Rich Road Solar Energy Center Solar + storage Β· Rich Road Solar Energy Center, LLC |
240 MW | In study |
| Garnet Energy Center Solar Β· Garnet Energy Center, LLC |
200 MW | In study |
| Hemlock Ridge Solar Solar Β· Hemlock Ridge Solar LLC |
200 MW | In study |
| Prattsburgh Wind Farm Onshore wind Β· Prattsburgh Wind, LLC |
147 MW | In study |
| Oxbow Hill Solar Solar Β· Oxbow Hill Solar, LLC |
140 MW | In study |
| Sugar Maple Solar Solar Β· Sugar Maple Solar, LLC |
125 MW | In study |
| NY38 Solar Solar Β· Greens Corners Solar LLC |
120 MW | In study |
| Holtsville 138kV Energy Storage Battery storage Β· Holtsville Energy Storage, LLC |
110 MW | In study |
| Riverside Solar Solar Β· Riverside Solar, LLC |
100 MW | In study |
| Astoria Energy Storage Battery storage Β· East River ESS, LLC |
100 MW | In study |
| Brookside Solar Solar Β· Brookside Solar, LLC |
100 MW | In study |
| Kce NY 5 Battery storage Β· KCE NY 5 LLC |
94.0 MW | In study |
| Harlem River Yard Battery storage Β· Harlem River ESS, LLC |
79.9 MW | In study |
| Luyster Creek Energy Storage 2 Battery storage Β· Eastern Generation, LLC |
79.0 MW | In study |
| Luyster Creek Energy Storage 1 Battery storage Β· Eastern Generation, LLC |
57.3 MW | In study |
| Bayonne Energy Center III Battery storage Β· Bayonne Energy Center III, LLC |
49.8 MW | In study |
| Hatchery Solar Solar Β· Hatchery Solar LLC |
20.0 MW | In study |
| Flat Hill Solar Solar Β· Flat Hill Solar NY LLC. |
20.0 MW | In study |
| Kce NY 10 Battery storage Β· KCE NY 10, LLC |
20.0 MW | In study |
| Fairway Solar Solar Β· Fairway Solar NY LLC |
20.0 MW | In study |
| Grassy Knoll Solar Solar Β· Grassy Knoll Solar NY LLC |
20.0 MW | In study |
| Hilltop Solar Solar Β· SunEast Hilltop Solar LLC |
20.0 MW | In study |
| CS Hawthorn Solar Solar Β· Hawthorn Solar, LLC |
20.0 MW | In study |
| NY13 Solar Solar Β· Bald Mountain Solar LLC |
20.0 MW | In study |
| Dolan Solar Solar Β· Dolan Solar, LLC |
20.0 MW | In study |
| Valley Solar Solar Β· Valley Solar NY LLC |
20.0 MW | In study |
| NY37 Solar Solar Β· Sandy Creek Solar LLC |
20.0 MW | In study |
| Luyster Creek Energy Storage 3 Battery storage Β· Eastern Generation, LLC |
15.0 MW | In study |
| Arthur Kill Energy Storage 1 Battery storage Β· Lighthouse Arthur Kill, LLC |
15.0 MW | In study |
| Highbanks Solar Solar Β· Highbanks Solar LLC |
12.5 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)36 Β· 21.8 GW
- West (non-ISO utilities)72 Β· 21.7 GW
- MISO (Midcontinent)130 Β· 20.0 GW
- PJM (Mid-Atlantic, Midwest)183 Β· 19.2 GW
- ERCOT (Texas)72 Β· 13.4 GW
- Southeast (non-ISO utilities)37 Β· 6,006 MW
- SPP (Southwest Power Pool)21 Β· 2,722 MW
- NYISO (New York)31 Β· 2,705 MW
- ISO-NE (New England)7 Β· 1,764 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)