OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in MISO (Midcontinent) (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)309 Β· 110.9 GW
- ERCOT (Texas)356 Β· 76.0 GW
- CAISO (California)107 Β· 53.4 GW
- Southeast (non-ISO utilities)210 Β· 24.0 GW
- SPP (Southwest Power Pool)82 Β· 15.1 GW
- PJM (Mid-Atlantic, Midwest)156 Β· 14.6 GW
- MISO (Midcontinent)23 Β· 3,679 MW
- ISO-NE (New England)6 Β· 1,053 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)