United States › Grid › Interconnection queues › Louisiana
SOLAR + STORAGE · MISOSolar + storage project J2152, Tangipahoa Parish County
Solar + storage project J2152, Tangipahoa Parish County is a 120 MW solar + storage request in interconnection study in the MISO interconnection queue, in Tangipahoa Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
- PlanningQueued Nov 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2152
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- INDEPENDENCE [LA] - HAMMOND 230.0kV
- Location
- Tangipahoa Parish County, Louisiana
- Technology
- Solar: 120 MW · Battery
- Total requested
- 120 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 30 November 2023
- Proposed online date
- September 2025
Location
Marker shows the centre of Tangipahoa Parish County; the queue data does not give exact sites.
Other requests in Tangipahoa Parish County
- Solar project J909, Tangipahoa Parish CountySolar · 100 MW · under construction
- Solar project J1219, Tangipahoa Parish CountySolar · 100 MW · under construction
- Battery storage project J1257, Tangipahoa Parish CountyBattery storage · 20.0 MW · under construction
- Amite Energy Storage IIBattery storage · 208 MW · in study
- Solar project J1870, Tangipahoa Parish CountySolar · 200 MW · in study
- Surplus; J909Other · 100 MW · in study
- Solar project J3365, Tangipahoa Parish CountySolar · 100 MW · withdrawn
- Battery storage project J1871, Tangipahoa Parish CountyBattery storage · 60.0 MW · withdrawn
- Battery storage project J2013, Tangipahoa Parish CountyBattery storage · 52.9 MW · withdrawn
- Solar project J1985, Tangipahoa Parish CountySolar · 50.0 MW · withdrawn
- Battery storage project J2012, Tangipahoa Parish CountyBattery storage · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem