United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J1985, Tangipahoa Parish County
Solar project J1985, Tangipahoa Parish County is a 50.0 MW solar request withdrawn in the MISO interconnection queue, in Tangipahoa Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2021 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1985
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- Chicken Farm - Amite
- Location
- Tangipahoa Parish County, Louisiana
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 30 November 2021
- Proposed online date
- October 2025
- Withdrawn
- October 2023
Location
Marker shows the centre of Tangipahoa Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Tangipahoa Parish County
- Solar project J909, Tangipahoa Parish CountySolar Β· 100 MW Β· under construction
- Solar project J1219, Tangipahoa Parish CountySolar Β· 100 MW Β· under construction
- Battery storage project J1257, Tangipahoa Parish CountyBattery storage Β· 20.0 MW Β· under construction
- Amite Energy Storage IIBattery storage Β· 208 MW Β· in study
- Solar project J1870, Tangipahoa Parish CountySolar Β· 200 MW Β· in study
- Solar + storage project J2152, Tangipahoa Parish CountySolar + storage Β· 120 MW Β· in study
- Surplus; J909Other Β· 100 MW Β· in study
- Solar project J3365, Tangipahoa Parish CountySolar Β· 100 MW Β· withdrawn
- Battery storage project J1871, Tangipahoa Parish CountyBattery storage Β· 60.0 MW Β· withdrawn
- Battery storage project J2013, Tangipahoa Parish CountyBattery storage Β· 52.9 MW Β· withdrawn
- Battery storage project J2012, Tangipahoa Parish CountyBattery storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem