United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2010 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Spinning Star Energy Onshore wind Β· Spinning Star Energy LLC |
615 MW | Withdrawn / abandoned |
| King County Wind Farm Onshore wind Β· King County Wind Energy, LLC |
332 MW | Withdrawn / abandoned |
| 2W Whatley Phase 2 Onshore wind Β· TripleT Renewable Enrgy Solutions, LLC |
290 MW | Withdrawn / abandoned |
| Spitfire Wind ph 1 Onshore wind Β· Clipper Windpower |
265 MW | Withdrawn / abandoned |
| Texas Clean C Coal Β· Summit Energy |
240 MW | Withdrawn / abandoned |
| Tuxedo I Onshore wind Β· Arranz Wind Tuxedo I,LLC |
200 MW | Withdrawn / abandoned |
| Val Verde Wind A Onshore wind Β· Akuo Energy USA |
180 MW | Withdrawn / abandoned |
| Rio Blanco Windfarm Onshore wind Β· Horizon Wind Energy |
151 MW | Withdrawn / abandoned |
| Spitfire Wind ph 2 Onshore wind Β· Clipper Windpower |
135 MW | Withdrawn / abandoned |
| Riviera Wind Onshore wind Β· Riviera Wind |
135 MW | Withdrawn / abandoned |
| Long Draw Energy Project Onshore wind Β· Turner/Ross Wind Development LLC |
112 MW | Withdrawn / abandoned |
| Sepanta Wind Project Onshore wind Β· Sepanta Wind Energy, LLC |
106 MW | Withdrawn / abandoned |
| White Camp Solar Solar Β· White Camp Energy, LLC |
100 MW | Withdrawn / abandoned |
| Rio Pecos Wind Project - Ph 2 Onshore wind Β· Akuo Energy USA |
100 MW | Withdrawn / abandoned |
| First Solar - Uvalde Solar Solar Β· First Solar |
90.0 MW | Withdrawn / abandoned |
| Wise County Plant Upgrade Gas Β· GDF-Suez Energy North America, Inc |
90.0 MW | Withdrawn / abandoned |
| Val Verde Wind B Onshore wind Β· Akuo Energy USA |
82.0 MW | Withdrawn / abandoned |
| Windwood Project Onshore wind Β· Lincoln Renewable Energy, LLC |
72.0 MW | Withdrawn / abandoned |
| RRE Austin Solar Solar Β· RRE Austin Solar, LLC |
60.0 MW | Withdrawn / abandoned |
| Big Springs Solar Solar Β· RRE Austin Solar, LLC |
60.0 MW | Withdrawn / abandoned |
| Rio Pecos Wind Project - Ph 1 Onshore wind Β· Akuo Energy USA |
50.0 MW | Withdrawn / abandoned |
| San Patricio Wind Onshore wind Β· International Power America |
50.0 MW | Withdrawn / abandoned |
| 2W Whatley Phase 1 Onshore wind Β· TripleT Renewable Enrgy Solutions, LLC |
45.0 MW | Withdrawn / abandoned |
| LWPC Wind Onshore wind Β· Lonestar Wind Power |
41.0 MW | Withdrawn / abandoned |
| West Texas Angelos Solar 2 Solar Β· Navasota Energy Management, LLC |
40.0 MW | Withdrawn / abandoned |
| Barilla Solar 2 Solar Β· First Solar |
21.0 MW | Withdrawn / abandoned |
| Hays Solar Solar Β· Hays Solar |
20.0 MW | Withdrawn / abandoned |
| HOVEY (Barilla Solar 1B) Solar Β· First Solar |
7.4 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)302 Β· 22.6 GW
- PJM (Mid-Atlantic, Midwest)361 Β· 21.6 GW
- CAISO (California)168 Β· 19.1 GW
- Southeast (non-ISO utilities)18 Β· 11.1 GW
- MISO (Midcontinent)72 Β· 10.9 GW
- SPP (Southwest Power Pool)50 Β· 9,058 MW
- ERCOT (Texas)28 Β· 3,689 MW
- ISO-NE (New England)12 Β· 1,337 MW
- NYISO (New York)5 Β· 1,285 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)