United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown18730.0 GW
Active in queue971 MW5 requests
Agreement signed971 MW5 requests
Withdrawn18730.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

187 requests Β· page 1 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Pathfinder Renewable Wind Energy
Onshore wind
3,000 MWWithdrawn / abandoned Platte, WYCAISO Mar 2011target 2020
Cowboy Mesa Wind
Onshore wind
1,700 MWWithdrawn / abandoned Lincoln, NMCAISO Mar 2011target 2016
Eagle Mountain Pump Storage #3
Hydro
1,400 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2017
Suncrest Imperial Segs
Solar
1,080 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2015
Central Valley I Segs
Solar
1,080 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Kern Solar Ranch (Fka California Solar Ranch)
Solar
1,000 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2018
WSP 3
Solar
800 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2018
CVH Power II
Solar
700 MWWithdrawn / abandoned Maricopa, AZCAISO Mar 2011target 2014
Jasper Segs (Fka Sonoran West II)
Solar
540 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2016
Hidden Hills Ranch
Solar
540 MWWithdrawn / abandoned Nye, NVCAISO Mar 2011target 2014
Central Valley II Segs
Solar
540 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Solar Four
Solar
510 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2017
Alta 15
Onshore wind
502 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2014
Blythe Mesa Solar II
Solar
500 MWWithdrawn / abandoned Riverside, CACAISO Nov 2011target 2015
Mesa Solar
Solar
500 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2018
Madison Solar
Solar
500 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2017
Calaveras Wind Project (100/383MW)
Other
483 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Black Rock 1,2,3,4, & 5,6
Geothermal
470 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2015
El Segundo Energy Center 2 ( Fka El Segundo Energy Center-II)
Gas
435 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2011target 2020
Hickory Solar Farm
Solar
400 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2014
Wellhead Power Kern 3
Gas
400 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Soldier Flat
Onshore wind
400 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Hydrogen Energy California ( Heca ) Project
Other
340 MWWithdrawn / abandoned Kern, CACAISO Nov 2011target 2017
Dunnigan
Onshore wind
301 MWWithdrawn / abandoned Yolo, CACAISO Mar 2011target 2014
Cordelia Hills Wind Power Plant
Onshore wind
301 MWWithdrawn / abandoned Napa, CACAISO Nov 2011target 2016
Desert Quartzite Solar
Solar
300 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2015
CVH Power I
Solar
300 MWWithdrawn / abandoned Maricopa, AZCAISO Mar 2011target 2014
CPV North City
Gas
300 MWWithdrawn / abandoned San Diego, CACAISO Mar 2011target 2015
Re Oasis
Solar
300 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
Lone Tree Wind
Onshore wind
299 MWWithdrawn / abandoned Alameda, CACAISO Mar 2011target 2013
Loop Ranch Wind
Onshore wind
299 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Gran Vista
Solar + storage
279 MWWithdrawn / abandoned Kern, CACAISO Apr 2011target 2024
Sandy Valley Phase I Segs (Fka Pahrump Valley Segs)
Solar
270 MWWithdrawn / abandoned Clark, NVCAISO Mar 2011target 2016
Sonoran West I Segs
Solar
270 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2016
Westlands Lemoore Solar
Solar
250 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2014
Arlington Valley Solar Energy II
Solar
250 MWWithdrawn / abandoned Maricopa, AZCAISO Mar 2011target 2015
Hyder Solar Energy Project
Solar
250 MWWithdrawn / abandoned Yuma, AZCAISO Mar 2011target 2014
Montezuma Wetlands
Onshore wind
250 MWWithdrawn / abandoned Solano, CACAISO Mar 2011target 2012
Fort Mojave Solar Farms 2
Solar
240 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2013
SP Blythe 1
Solar
221 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2018
Desert Bell Solar
Solar
200 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
Mount Signal Solar Farm III
Solar
200 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2014
Silurian Valley Wind
Onshore wind
200 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2015
Daggett Solar Project
Solar
200 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2018
Mojave View Solar
Solar
200 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Sun Valley Energy Center-1
Solar
200 MWWithdrawn / abandoned Maricopa, AZCAISO Nov 2011target 2016
Tulare Solar
Solar
150 MWWithdrawn / abandoned Tulare, CACAISO Mar 2011target 2014
Candlewood Wind
Onshore wind
150 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2013
Acorn Greenworks
Solar
150 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2021
Maricopa California Solar Farms II
Solar
150 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Page 1 of 4

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)