Queue requests in study in CAISO (California)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown19492.4 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

194 requests Β· page 1 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Jove Solar
Solar + storage
4,133 MWIn study La Paz, AZCAISO Apr 2021target 2030
Muon
Solar + storage
2,339 MWIn study Fresno, CACAISO Apr 2023target 2028
Stanley
Solar + storage
2,071 MWIn study Maricopa, AZCAISO Apr 2023target 2030
Quark
Solar + storage
2,045 MWIn study Fresno, CACAISO Apr 2023target 2028
Bouse Solar And Storage Plant
Solar + storage
2,021 MWIn study La Paz, AZCAISO Apr 2021target 2033
Ripple
Solar + storage
1,880 MWIn study Kings, CACAISO Apr 2023target 2031
Plum
Solar + storage
1,560 MWIn study Kings, CACAISO Apr 2021target 2031
Ranegras PVS
Solar + storage
1,438 MWIn study La Paz, AZCAISO Apr 2021target 2029
Sunflower
Solar + storage
1,430 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Arida 2 Solar Farm
Solar + storage
1,400 MWIn study Clark, NVCAISO Apr 2019target 2029
Broadview
Solar + storage
1,308 MWIn study Fresno, CACAISO Apr 2023target 2028
Matterhorn
Other
1,218 MWIn study Riverside, CACAISO Apr 2023target 2029
Solstice B
Solar + storage
1,211 MWIn study Fresno, CACAISO Apr 2023target 2031
Aviation
Gas
1,200 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Pion
Battery storage
1,168 MWIn study Fresno, CACAISO Apr 2023target 2028
Solstice A
Solar + storage
1,111 MWIn study Fresno, CACAISO Apr 2023target 2031
Hillside Energy Storage
Battery storage
1,065 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Musketeers
Solar + storage
1,047 MWIn study Tulare, CACAISO Apr 2023target 2029
Water Rock Solar 2
Solar + storage
1,034 MWIn study Nye, NVCAISO Apr 2021target 2028
Crusade
Battery storage
1,029 MWIn study Orange, CACAISO Apr 2023target 2028
Lagoonez
Battery storage
1,029 MWIn study Los Angeles, CACAISO Apr 2023target 2028
Alisa Solar Energy Complex 2
Solar + storage
1,000 MWIn study Yuma, AZCAISO Apr 2023target 2030
Bristlecone
Solar + storage
921 MWIn study Nye, NVCAISO Apr 2023target 2030
Hoodini
Solar + storage
910 MWIn study Yuma, AZCAISO Apr 2019target 2028
Arida 3 Solar Farm
Solar + storage
900 MWIn study Clark, NVCAISO Apr 2020target 2030
Invictus
Solar + storage
860 MWIn study Riverside, CACAISO Apr 2021target 2029
Amanece
Solar + storage
836 MWIn study Stanislaus, CACAISO Apr 2023target 2029
Carissalito Creek
Solar + storage
832 MWIn study Merced, CACAISO Apr 2023target 2030
Artemis
Solar + storage
825 MWIn study Kern, CACAISO Apr 2021target 2029
Harquahala Flats 2
Solar + storage
822 MWIn study Maricopa, AZCAISO Apr 2021target 2028
Valley Sunlight Refinery
Solar + storage
821 MWIn study Kings, CACAISO Apr 2021target 2032
Maravillosa 2
Solar + storage
812 MWIn study Kern, CACAISO Apr 2023target 2029
Solsken
Solar + storage
809 MWIn study Tulare, CACAISO Apr 2021target 2033
Socorro Peak Solar
Solar + storage
756 MWIn study La Paz, AZCAISO Apr 2021target 2029
Stable
Solar + storage
750 MWIn study Fresno, CACAISO Apr 2023target 2031
Sunglow
Solar + storage
744 MWIn study Kings, CACAISO Apr 2023target 2030
Arida Solar Farm
Solar + storage
740 MWIn study Clark, NVCAISO Apr 2018target 2027
Sunrise Power Improvement
Gas
656 MWIn study Kern, CACAISO Apr 2020target 2024
Yuha Desert Battery Storage
Battery storage
633 MWIn study Imperial, CACAISO Apr 2021target 2031
Cherry Lane Hybrid
Solar + storage
621 MWIn study Kern, CACAISO Apr 2021target 2031
Harquahala Sunrise
Solar + storage
618 MWIn study Maricopa, AZCAISO Apr 2020target 2030
Remy
Solar + storage
617 MWIn study Yuma, AZCAISO Apr 2021target 2029
Larrea Solar
Solar + storage
614 MWIn study Clark, NVCAISO Apr 2021target 2028
Sunvine
Solar + storage
614 MWIn study Kern, CACAISO Apr 2023target 2031
Maestro
Solar + storage
609 MWIn study Fresno, CACAISO Apr 2023target 2029
Duran
Gas
600 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Soleil Cantil
Solar + storage
597 MWIn study Kern, CACAISO Apr 2021target 2033
Sienna 3
Solar + storage
576 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Soledad Solar
Solar
562 MWIn study Kern, CACAISO Apr 2023target 2028
Domestic Chicken
Solar
559 MWIn study Maricopa, AZCAISO Apr 2023target 2029
Page 1 of 4

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)