United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in CAISO (California)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Jove Solar Solar + storage |
4,133 MW | In study |
| Muon Solar + storage |
2,339 MW | In study |
| Stanley Solar + storage |
2,071 MW | In study |
| Quark Solar + storage |
2,045 MW | In study |
| Bouse Solar And Storage Plant Solar + storage |
2,021 MW | In study |
| Ripple Solar + storage |
1,880 MW | In study |
| Plum Solar + storage |
1,560 MW | In study |
| Ranegras PVS Solar + storage |
1,438 MW | In study |
| Sunflower Solar + storage |
1,430 MW | In study |
| Arida 2 Solar Farm Solar + storage |
1,400 MW | In study |
| Broadview Solar + storage |
1,308 MW | In study |
| Matterhorn Other |
1,218 MW | In study |
| Solstice B Solar + storage |
1,211 MW | In study |
| Aviation Gas |
1,200 MW | In study |
| Pion Battery storage |
1,168 MW | In study |
| Solstice A Solar + storage |
1,111 MW | In study |
| Hillside Energy Storage Battery storage |
1,065 MW | In study |
| Musketeers Solar + storage |
1,047 MW | In study |
| Water Rock Solar 2 Solar + storage |
1,034 MW | In study |
| Crusade Battery storage |
1,029 MW | In study |
| Lagoonez Battery storage |
1,029 MW | In study |
| Alisa Solar Energy Complex 2 Solar + storage |
1,000 MW | In study |
| Bristlecone Solar + storage |
921 MW | In study |
| Hoodini Solar + storage |
910 MW | In study |
| Arida 3 Solar Farm Solar + storage |
900 MW | In study |
| Invictus Solar + storage |
860 MW | In study |
| Amanece Solar + storage |
836 MW | In study |
| Carissalito Creek Solar + storage |
832 MW | In study |
| Artemis Solar + storage |
825 MW | In study |
| Harquahala Flats 2 Solar + storage |
822 MW | In study |
| Valley Sunlight Refinery Solar + storage |
821 MW | In study |
| Maravillosa 2 Solar + storage |
812 MW | In study |
| Solsken Solar + storage |
809 MW | In study |
| Socorro Peak Solar Solar + storage |
756 MW | In study |
| Stable Solar + storage |
750 MW | In study |
| Sunglow Solar + storage |
744 MW | In study |
| Arida Solar Farm Solar + storage |
740 MW | In study |
| Sunrise Power Improvement Gas |
656 MW | In study |
| Yuha Desert Battery Storage Battery storage |
633 MW | In study |
| Cherry Lane Hybrid Solar + storage |
621 MW | In study |
| Harquahala Sunrise Solar + storage |
618 MW | In study |
| Remy Solar + storage |
617 MW | In study |
| Larrea Solar Solar + storage |
614 MW | In study |
| Sunvine Solar + storage |
614 MW | In study |
| Maestro Solar + storage |
609 MW | In study |
| Duran Gas |
600 MW | In study |
| Soleil Cantil Solar + storage |
597 MW | In study |
| Sienna 3 Solar + storage |
576 MW | In study |
| Soledad Solar Solar |
562 MW | In study |
| Domestic Chicken Solar |
559 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 Β· 455.6 GW
- ERCOT (Texas)1,408 Β· 328.0 GW
- MISO (Midcontinent)1,337 Β· 302.2 GW
- Southeast (non-ISO utilities)815 Β· 118.5 GW
- SPP (Southwest Power Pool)480 Β· 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 Β· 105.4 GW
- CAISO (California)194 Β· 92.4 GW
- NYISO (New York)190 Β· 27.1 GW
- ISO-NE (New England)27 Β· 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)