United States › Grid › Interconnection queues › Nevada

SOLAR + STORAGE · CAISO

Larrea Solar

Larrea Solar is a 614 MW solar + storage request in interconnection study in the CAISO interconnection queue, in Clark County, Nevada, connecting to GLW.

Queue statusIn planning
  1. PlanningQueued Apr 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2150
Grid region
CAISO (California)
Utility / transmission owner
GLW
Connection point (POI)
Trout Canyon Substation 230 kV
Location
Clark County, Nevada
Technology
Solar: 307 MW · Battery: 307 MW
Total requested
614 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
15 April 2021
Proposed online date
September 2028

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada · Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem