United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESProjects with signed interconnection agreements in CAISO (California)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Atlas Complex Solar + storage |
4,357 MW | Agreement signed |
| Darden Solar + storage |
2,365 MW | Agreement signed |
| Umbriel Solar + storage |
2,365 MW | Agreement signed |
| Wingtip Solar 1 Solar + storage |
2,352 MW | Agreement signed |
| Angeleno Solar Farm Solar + storage |
2,300 MW | Agreement signed |
| Holman Wind + storage |
2,282 MW | Agreement signed |
| Sanborn Hybrid 3 Solar + storage |
2,159 MW | Agreement signed |
| Buttonbush Solar Hybrid Energy Center Solar + storage |
1,636 MW | Agreement signed |
| Euismod Solar + storage |
1,247 MW | Agreement signed |
| Potentia-Viridi Other |
1,225 MW | Agreement signed |
| Mosey Solar + storage |
1,081 MW | Agreement signed |
| Oberon Solar + storage |
1,037 MW | Agreement signed |
| Silver Star Solar Solar + storage |
1,034 MW | Agreement signed |
| Windwalker Offshore Offshore wind |
1,029 MW | Agreement signed |
| Sunbaked Solar Solar + storage |
1,024 MW | Agreement signed |
| Rock Valley Energy Center Solar + storage |
1,024 MW | Agreement signed |
| Descendant Ranch 1 Solar + storage |
1,024 MW | Agreement signed |
| Grace Energy Center Solar + storage |
1,017 MW | Agreement signed |
| Bellefield Solar Farm Solar + storage |
1,000 MW | Agreement signed |
| Bellefield 2 Solar Farm Solar + storage |
1,000 MW | Agreement signed |
| Pelicans Jaw Hybrid Solar Solar + storage |
1,000 MW | Agreement signed |
| Easley Solar + storage |
940 MW | Agreement signed |
| Athos Power Plant Solar + storage |
908 MW | Agreement signed |
| Purple Sage Energy Center Solar + storage |
817 MW | Agreement signed |
| Lycan Solar Solar + storage |
800 MW | Agreement signed |
| Scarlet Solar + storage |
800 MW | Agreement signed |
| Calypso Solar Solar + storage |
800 MW | Agreement signed |
| Irving Storage Battery storage |
783 MW | Agreement signed |
| Antelope Solar 2 Solar + storage |
782 MW | Agreement signed |
| Centennial Flats Solar + storage |
767 MW | Agreement signed |
| Silver Ridge Mount Signal Solar + storage |
750 MW | Agreement signed |
| CPC West Wind + storage |
750 MW | Agreement signed |
| Kingsley Solar Farm Solar + storage |
720 MW | Agreement signed |
| Buttonbush Solar 2 Solar + storage |
716 MW | Agreement signed |
| Presidio Solar + storage |
713 MW | Agreement signed |
| Sanborn Solar 2 Solar + storage |
707 MW | Agreement signed |
| Kawich Solar + storage |
700 MW | Agreement signed |
| Menifee Power Bank Battery storage |
680 MW | Agreement signed |
| Steel City Battery Storage Battery storage |
675 MW | Agreement signed |
| Bonanza Peak Solar Farm Solar + storage |
641 MW | Agreement signed |
| Cady Solar Solar + storage |
626 MW | Agreement signed |
| Willow Rock Energy Storage Other |
620 MW | Agreement signed |
| Australis Solar + storage |
614 MW | Agreement signed |
| Daylight Solar + storage |
611 MW | Agreement signed |
| Cornucopia Hybrid Solar + storage |
605 MW | Agreement signed |
| Bonanza Solar Solar + storage |
600 MW | Agreement signed |
| Twin Palms Solar Solar + storage |
576 MW | Agreement signed |
| Sanborn 5 Hybrid Solar |
560 MW | Agreement signed |
| Rosamond West Solar Solar + storage |
555 MW | Agreement signed |
| Redonda Solar + storage |
542 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)578 Β· 119.3 GW
- CAISO (California)235 Β· 96.2 GW
- West (non-ISO utilities)349 Β· 60.6 GW
- Southeast (non-ISO utilities)192 Β· 37.8 GW
- SPP (Southwest Power Pool)212 Β· 37.6 GW
- PJM (Mid-Atlantic, Midwest)343 Β· 35.0 GW
- MISO (Midcontinent)187 Β· 28.1 GW
- ISO-NE (New England)45 Β· 8,609 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)