United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 90
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Edgewood BESS 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 7 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Blackland Prairie 3 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| San Bernard Solar II Solar · San Bernard Solar II, LLC |
102 MW | Paused / redesign |
| Two Rivers Solar Solar + storage |
102 MW | In study |
| Pajaro Valley Storage Battery storage |
102 MW | In study |
| Battery storage project GEN-2025-SR7, Muskogee County Battery storage |
102 MW | In study |
| Opuntia Solar SLF Solar + storage · Opuntia Solar, LLC |
102 MW | In study |
| Crocus Solar Solar + storage · Crocus Solar, LLC |
102 MW | In study |
| Roxton Storage Solar + storage · Roxton Solar, LLC |
102 MW | In study |
| Half Moon 2 BESS Battery storage |
102 MW | Paused / redesign |
| Droga Battery storage |
102 MW | In study |
| Kurtz Solar SLF Solar + storage · Kurtz Solar, LLC |
102 MW | In study |
| Pisgah Ridge Solar 2 Solar + storage · Pisgah Ridge Solar 2, LLC |
102 MW | In study |
| Myers Solar Solar + storage · BT Myers Solar, LLC |
102 MW | In study |
| Kennedy Solar Solar + storage · Kennedy Bypass Solar LLC |
102 MW | In study |
| Jayhawk Solar Solar · Renewable Energy Ventures, LLC |
102 MW | In study |
| Battery storage project GEN-2023-SR27, Mayes County Battery storage |
102 MW | In study |
| Gas project CS25-05, Kootenai County Gas |
102 MW | In study |
| Gas project CS25-04, Kootenai County Gas |
102 MW | In study |
| Triangle Ranch Delta Onshore wind |
102 MW | Paused / redesign |
| Rose Quartz BESS Battery storage · Rose Quartz BESS, LLC |
101 MW | In study |
| Pisgah Ridge Storage 3 Solar + storage · Pisgah Ridge 3, LLC |
101 MW | In study |
| Blanket Ranch South Solar Solar + storage · Blanket Ranch South Solar, LLC |
101 MW | In study |
| Margay Energy Storage Battery storage · PowerPulse LLC |
101 MW | In study |
| Maddox Solar Solar · Industrial Lima Project LLC |
101 MW | In study |
| Pinnacle Point Energy Storage Battery storage · GCI Pinnacle Point, LLC |
101 MW | In study |
| Blue Creek Energy Storage Battery storage · Blue Creek Energy Storage, LLC |
101 MW | In study |
| Kinney County Energy Battery storage · Kinney County Energy, LLC |
101 MW | In study |
| Lyford Energy Battery storage · Lyford Energy, LLC |
101 MW | In study |
| Southside Energy Battery storage · Southside Energy, LLC |
101 MW | In study |
| Hadrian Energy Storage Battery storage · Hadrian Energy Storage, LLC |
101 MW | In study |
| Hynes Bay Energy Storage Battery storage · Hynes Bay Energy Storage, LLC |
101 MW | In study |
| Strawberry Dunes Solar SLF Solar + storage · Strawberry Dunes LLC |
101 MW | In study |
| Solar project G0368, Wasco County Solar |
101 MW | In study |
| Saltillo Storage Battery storage |
101 MW | Paused / redesign |
| Las Moras Battery Battery storage · Las Moras Storage, LLC |
101 MW | In study |
| Solar Star Frontier BESS Battery storage · Solar Star Frontier BESS, LLC |
101 MW | In study |
| Luthor Solar Solar · TREX US Luthor LLC |
101 MW | In study |
| Vaca Storage Battery storage · Long Mount Storage, LLC |
101 MW | In study |
| Glory Bee Storage Solar + storage · Riley Solar LLC |
101 MW | In study |
| Sandford Storage Solar + storage · BT Sandford Solar, LLC |
101 MW | In study |
| Long Point Solar II Solar |
101 MW | Paused / redesign |
| Eiger Energy Storage Battery storage |
101 MW | In study |
| Pinewood BESS Battery storage |
101 MW | Paused / redesign |
| Hide Town Energy Storage Battery storage · Hide Town Energy Storage LLC |
101 MW | In study |
| Inertia BESS 2 Battery storage |
101 MW | Paused / redesign |
| High Bridge Wind Onshore wind · High Bridge Wind, LLC |
101 MW | In study |
| Venus Mill Storage Battery storage |
101 MW | Paused / redesign |
| Padrino BESS Battery storage |
101 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)