United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA (2023 requests) — page 9
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Container Solar |
205 MW | In study |
| Grapevine 1 Solar |
205 MW | In study |
| Nelson Hills Solar |
205 MW | In study |
| Arc Energy Storage Battery storage · Paris Energy Storage, LLC |
205 MW | In study |
| Charro Creek Solar 1 SLF Solar + storage · Charro Creek Solar LLC |
203 MW | In study |
| Charro Creek Solar 2 SLF Solar + storage · Charro Creek Solar LLC |
203 MW | In study |
| Charro Creek Solar 3 SLF Solar + storage · Charro Creek Solar LLC |
203 MW | In study |
| Gas project GEN-2022-147, Hale County Gas |
203 MW | In study |
| Elan BESS Battery storage · Elan BESS, LLC |
203 MW | In study |
| Brundage Energy Storage Battery storage |
202 MW | In study |
| Solar + storage project G0945, Fremont County Solar + storage |
202 MW | In study |
| Exodus BESS Battery storage · Exodus Solar LLC |
201 MW | In study |
| El Molino Solar SLF Solar + storage · El Molino Solar, LLC |
201 MW | In study |
| Rush ESS Battery storage · OCI Solar Power LLC |
201 MW | In study |
| Nockenut Springs Solar 5 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Savannah Oaks Solar Solar · Savannah Oaks Solar Project LLC |
201 MW | In study |
| Marcus Energy Storage Battery storage · Marcus Energy Storage, LLC |
201 MW | In study |
| Copano Bay Energy Storage Battery storage · Copano Bay Energy Storage, LLC |
201 MW | In study |
| Timberline Solar Solar + storage · Timberline Renewables, LLC |
201 MW | In study |
| Castle Corral BESS Battery storage |
201 MW | Paused / redesign |
| Cottontail Energy Center Battery storage · Cottontail Energy Center, LLC |
201 MW | In study |
| Kahla Storage Battery storage · BT Kahla Storage, LLC |
201 MW | In study |
| Fike BESS Battery storage · BRP Blue Topaz 9, LLC |
201 MW | In study |
| Falcon Zapata Storage 138 Battery storage · Falcon BESS, LLC |
201 MW | In study |
| Augie BESS Battery storage · BRP Blue Topaz 5, LLC |
201 MW | In study |
| Bobcat Cameron BESS Battery storage · Bobcat BESS, LLC |
201 MW | In study |
| Longday Solar SLF Solar + storage · Longday Solar |
201 MW | In study |
| Stinger Energy Storage Battery storage · Stinger Energy Storage LLC |
201 MW | In study |
| Beitel Energy Storage Battery storage · Brazos Energy Storage, LLC |
201 MW | In study |
| Red Top Solar I Solar · Cat Red Top Solar, LLC |
201 MW | In study |
| JackGard BESS Battery storage · Jackgard BESS |
201 MW | In study |
| Vaughn Energy Storage Battery storage · Vaughn Battery Storage, LLC |
201 MW | In study |
| Battery storage project J1895, Kenosha County Battery storage |
200 MW | In study |
| Battery storage project GEN-2023-037, Wyandotte County Battery storage |
200 MW | In study |
| SunShiner ESS Battery storage · SunShiner ESS LLC |
200 MW | In study |
| Onshore wind project 3RSC-2023-03, Kiowa County Onshore wind |
200 MW | In study |
| Solar project IC-1113, Lamar County Solar |
200 MW | Paused / redesign |
| Battery storage project GEN-2022-155, Oklahoma County Battery storage |
200 MW | In study |
| Solar project G1002, Sherman County Solar |
200 MW | In study |
| Solar project GEN-2023-038, Coal County Solar |
200 MW | In study |
| Battery storage project 600, Clay County Battery storage |
200 MW | In study |
| Solar + storage project GEN-2023-064, Le Flore County Solar + storage |
200 MW | In study |
| Battery storage project GEN-2022-142, Clay County Battery storage |
200 MW | In study |
| Solar + storage project IA-PNM-2023-22, Santa Fe County Solar + storage |
200 MW | In study |
| Battery storage project 23-239, Multnomah County Battery storage |
200 MW | In study |
| Tendril Solar + storage |
200 MW | In study |
| Other project GEN-2023-059, Harrison County Other |
200 MW | In study |
| Solar project 3RSC-2023-01, Pueblo County Solar |
200 MW | In study |
| Battery storage project GEN-2022-144, Jackson County Battery storage |
200 MW | In study |
| Solar + storage project 710, Ada County Solar + storage |
200 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)291 · 107.5 GW
- CAISO (California)107 · 53.4 GW
- ERCOT (Texas)253 · 51.8 GW
- Southeast (non-ISO utilities)157 · 17.0 GW
- PJM (Mid-Atlantic, Midwest)156 · 14.6 GW
- SPP (Southwest Power Pool)73 · 14.1 GW
- MISO (Midcontinent)22 · 3,354 MW
- ISO-NE (New England)6 · 1,053 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)