BATTERY STORAGE · ERCOT

Arc Energy Storage

Arc Energy Storage is a 205 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Lamar County, Texas.

Queue statusIn planning
  1. PlanningQueued Jul 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0184
Grid region
ERCOT (Texas)
Developer
Paris Energy Storage, LLC
Connection point (POI)
Tap 138kV 1693 Paris Switch - 11806 ENLOE T8
Location
Lamar County, Texas
Technology
Battery: 205 MW
Total requested
205 MW
Study phase
SS Completed, FIS Completed, No IA
Queue status
Active
Entered queue
31 July 2023
Proposed online date
April 2028

Location

Marker shows the centre of Lamar County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Lamar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem