United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Vaughn Energy Storage

Vaughn Energy Storage is a 201 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Grimes County, Texas.

Queue statusIn planning
  1. PlanningQueued Aug 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0200
Grid region
ERCOT (Texas)
Developer
Vaughn Battery Storage, LLC
Connection point (POI)
13 Keith 138kV
Location
Grimes County, Texas
Technology
Battery: 201 MW
Total requested
201 MW
Study phase
SS Completed, FIS Completed, No IA
Queue status
Active
Entered queue
21 August 2023
Proposed online date
December 2027

Location

Marker shows the centre of Grimes County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Grimes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem