Completed queue projects in Southeast (non-ISO utilities) — page 8

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown529112.4 GW
Active in queue161.4 GW1,067 requests
Agreement signed37.8 GW192 requests
Withdrawn2,738603.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

529 requests · page 8 of 11
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 380C, Washington County
Solar · FPL
74.5 MWOperating Washington, FLSoutheast Feb 20202023
Solar project 348B, Gadsden County
Solar · FPL
74.5 MWOperating Gadsden, FLSoutheast Jun 20182023
Solar project 173, Levy County
Solar · Florida Renewable Partners, LLC
74.5 MWOperating Levy, FLSoutheast Dec 20162025
Solar project 334, St. Lucie County
Solar · FPL
74.5 MWOperating St. Lucie, FLSoutheast Feb 20182023
Solar project 203, Brevard County
Solar · FPL
74.5 MWOperating Brevard, FLSoutheast Sep 20162021
Solar project 248A, Jackson County
Solar · FPL
74.5 MWOperating Jackson, FLSoutheast Apr 20172021
Solar project 258
Solar · FPL
74.5 MWOperating Southeast Jun 20172020
Solar project 202
Solar · FPL
74.5 MWOperating Southeast Sep 20162020
LaFayette Solar
Solar
72.0 MWOperating Chambers, ALSoutheast 2017
Gas project 334, Polk County
Gas · Duke Energy Florida, LLC
72.0 MWOperating Polk, FLSoutheast Jul 20232024
Gas project 218, Benton County
Gas
70.0 MWOperating Benton, MSSoutheast Dec 2008
SR Cedar Springs
Solar
70.0 MWOperating Early, GASoutheast Dec 20232022
Solar project 17116
Solar · Duke Energy Carolinas LLC
70.0 MWOperating Southeast Nov 20162020
Gas project 24, Polk County
Gas · NorthernStar
70.0 MWOperating Polk, FLSoutheast Jun 20052006
Hobnail Solar
Solar
70.0 MWOperating Burke, GASoutheast Aug 20192024
Other project 12, Beaufort County
Other · SCPSA
70.0 MWOperating Beaufort, SCSoutheast Apr 2001target 2005
SR Perry
Solar
68.0 MWOperating Houston, GASoutheast Dec 2023
Solar project 291, Colbert County
Solar
67.0 MWOperating Colbert, ALSoutheast Apr 2016
Other project 33, Georgetown County
Other · IPCO
65.0 MWOperating Georgetown, SCSoutheast Oct 2011target 2012
GRP Franklin
Other
65.0 MWOperating Franklin, GASoutheast 2019
GPC Mossy Branch Battery Storage Station
Battery storage
65.0 MWOperating Talbot, GASoutheast Apr 20202024
GRP Madison
Other
65.0 MWOperating Madison, GASoutheast 2019
Solar project 17, Hillsborough County
Solar
65.0 MWOperating Hillsborough, FLSoutheast Apr 2017target 2018
Solar project 4910, Duplin County
Solar · Duke Energy Progress, LLC
64.8 MWOperating Duplin, NCSoutheast Apr 20122015
Solar project 279, Shelby County
Solar
60.0 MWOperating Shelby, TNSoutheast Feb 2016
Solar project 9637
Solar · Monroe Solar Farm
60.0 MWOperating Southeast Apr 20152017
Solar project 41, Polk County
Solar
60.0 MWOperating Polk, FLSoutheast Dec 2017target 2020
Solar project 34, Polk County
Solar
60.0 MWOperating Polk, FLSoutheast Sep 2017target 2019
Tanglewood Solar
Solar
57.5 MWOperating Mitchell, GASoutheast 2020
Nuclear project 231, Rhea County
Nuclear
57.0 MWOperating Rhea, TNSoutheast Feb 2012
Solar project 32, Polk County
Solar
56.0 MWOperating Polk, FLSoutheast Aug 2017target 2019
Solar project 74, Horry County
Solar · Landrace
55.0 MWOperating Horry, SCSoutheast Jan 2018target 2019
Meridian 55 MW
Solar
55.0 MWOperating Lauderdale, MSSoutheast 2020
Solar project 35, Polk County
Solar
55.0 MWOperating Polk, FLSoutheast Nov 2017target 2021
Solar project 2, Pasco County
Solar
54.6 MWOperating Pasco, FLSoutheast Apr 2017target 2020
SR Hazlehurst II (aka S. Loving)
Solar
53.0 MWOperating Jeff Davis, GASoutheast Dec 2023
Piedmont Green Power
Other
53.0 MWOperating Lamar, GASoutheast 2013
Live Oak Solar
Solar
51.0 MWOperating Candler, GASoutheast 2016
Other project 28, Marlboro County
Other · Domtar
51.0 MWOperating Marlboro, SCSoutheast May 2009target 2010
Mesco
Gas
50.0 MWOperating Southeast 2001
Other project 6, Horry County
Other · SCPSA
50.0 MWOperating Horry, SCSoutheast Apr 2001target 2005
Gas project 309, Murray County
Gas
50.0 MWOperating Murray, GASoutheast Jan 2017
Solar project 328B, Bay County
Solar · FPL
50.0 MWOperating Bay, FLSoutheast Dec 20172023
Battery storage project 379, Lowndes County
Battery storage
50.0 MWOperating Lowndes, MSSoutheast Jun 2019target 2023
Sumrall Solar
Solar
50.0 MWOperating Lamar, MSSoutheast 2018
Battery storage project 380, Lowndes County
Battery storage
50.0 MWOperating Lowndes, MSSoutheast Jun 2019target 2023
Solar project 378, Lowndes County
Solar
50.0 MWOperating Lowndes, MSSoutheast Jun 2019target 2023
Solar project 273, Miami-Dade County
Solar · FPL
50.0 MWOperating Miami-Dade, FLSoutheast Jun 20172025
Gas project 116552
Gas · Broad River Energy LLC
50.0 MWOperating Southeast May 2020
Hattiesburg Farm
Solar
49.6 MWOperating Forrest, MSSoutheast 2017
Page 8 of 11

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)