United States › Grid › Interconnection queues › Mississippi

BATTERY STORAGE · SOUTHEAST

Battery storage project 380, Lowndes County

Battery storage project 380, Lowndes County is a 50.0 MW battery storage request built and operating in the Southeast interconnection queue, in Lowndes County, Mississippi, connecting to Tennessee Valley Authority.

Queue statusOperating
  1. PlanningQueued Jun 2019 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingTarget May 2023 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
380
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Location
Lowndes County, Mississippi
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Study phase
IA Executed
Queue status
Operational
Entered queue
11 June 2019
Proposed online date
May 2023

Location

Marker shows the centre of Lowndes County; the queue data does not give exact sites.

Power plants in Mississippi · Transmission lines in Mississippi

Other requests in Lowndes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem