SOLAR Β· SOUTHEASTSolar project 17116
Solar project 17116 is a 70.0 MW solar request built and operating in the Southeast interconnection queue.
Request details
- Queue ID
- 17116
- Grid region
- Southeast (non-ISO utilities)
- Developer
- Duke Energy Carolinas LLC
- Connection point (POI)
- Mull W
- Technology
- Solar: 70.0 MW
- Total requested
- 70.0 MW
- Study phase
- Commercial Operation - Commercial Operation Date Declared
- Queue status
- Operational
- Entered queue
- 22 November 2016
- Proposed online date
- December 2020
- Came online
- December 2020