United States › Grid › Interconnection queues › South Carolina
SOLAR · SOUTHEASTSolar project 74, Horry County
Solar project 74, Horry County is a 55.0 MW solar request built and operating in the Southeast interconnection queue, in Horry County, South Carolina, connecting to Santee Cooper.
Request details
- Queue ID
- 74
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Developer
- Landrace
- Location
- Horry County, South Carolina
- Technology
- Solar: 55.0 MW
- Total requested
- 55.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Operational
- Queue status
- Operational
- Entered queue
- 4 January 2018
- Proposed online date
- December 2019
Location
Marker shows the centre of Horry County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Horry County
- Solar project 211, Horry CountySolar · 74.8 MW · in study
- Solar project 109, Horry CountySolar · 64.0 MW · in study
- Coal project 4, Horry CountyCoal · 170 MW · built
- Solar project 48, Horry CountySolar · 75.0 MW · built
- Other project 6, Horry CountyOther · 50.0 MW · built
- Other project 10, Horry CountyOther · 35.0 MW · built
- Gas project 3, Horry CountyGas · 22.0 MW · built
- Gas project 153, Horry CountyGas · 113 MW · withdrawn
- Solar + storage project 140, Horry CountySolar + storage · 100 MW · withdrawn
- Solar project 79, Horry CountySolar · 100 MW · withdrawn
- Solar project 94, Horry CountySolar · 75.0 MW · withdrawn
- Solar project 138, Horry CountySolar · 74.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem