United States β€Ί Grid β€Ί Interconnection queues β€Ί South Carolina

SOLAR Β· SOUTHEAST

Solar project 94, Horry County

Solar project 94, Horry County is a 75.0 MW solar request withdrawn in the Southeast interconnection queue, in Horry County, South Carolina, connecting to Santee Cooper.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
94
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Santee Cooper
Location
Horry County, South Carolina
Technology
Solar: 75.0 MW
Total requested
75.0 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
11 April 2018
Proposed online date
June 2018

Location

Marker shows the centre of Horry County; the queue data does not give exact sites.

Power plants in South Carolina Β· Transmission lines in South Carolina

Other requests in Horry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem