SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 140, Horry County
Solar + storage project 140, Horry County is a 100 MW solar + storage request withdrawn in the Southeast interconnection queue, in Horry County, South Carolina, connecting to Santee Cooper.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 140
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Horry County, South Carolina
- Technology
- Solar: 100 MW Β· Battery
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 8 May 2020
- Proposed online date
- December 2022
Location
Marker shows the centre of Horry County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Horry County
- Solar project 211, Horry CountySolar Β· 74.8 MW Β· in study
- Solar project 109, Horry CountySolar Β· 64.0 MW Β· in study
- Coal project 4, Horry CountyCoal Β· 170 MW Β· built
- Solar project 48, Horry CountySolar Β· 75.0 MW Β· built
- Solar project 74, Horry CountySolar Β· 55.0 MW Β· built
- Other project 6, Horry CountyOther Β· 50.0 MW Β· built
- Other project 10, Horry CountyOther Β· 35.0 MW Β· built
- Gas project 3, Horry CountyGas Β· 22.0 MW Β· built
- Gas project 153, Horry CountyGas Β· 113 MW Β· withdrawn
- Solar project 79, Horry CountySolar Β· 100 MW Β· withdrawn
- Solar project 94, Horry CountySolar Β· 75.0 MW Β· withdrawn
- Solar project 138, Horry CountySolar Β· 74.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem