United States › Grid › Interconnection queues › Massachusetts
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Massachusetts — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Canton 470 110A - 2023 EE GB ASO Battery storage |
5.0 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Uxbridge Substation – NG Hopedale West Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| BESS Battery storage |
5.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
4.9 MW | Withdrawn / abandoned |
| Medway 65 110A - 2023 EE GB ASO Battery storage |
4.9 MW | Withdrawn / abandoned |
| Solar Solar |
4.9 MW | Withdrawn / abandoned |
| Whitins Pond Substation – NG Hopedale West Group Study Battery storage |
4.9 MW | Withdrawn / abandoned |
| HGE Group Study Battery storage |
4.9 MW | Withdrawn / abandoned |
| Whitins Pond Substation – NG Hopedale West Group Study Battery storage |
4.9 MW | Withdrawn / abandoned |
| Pondville - NG Western MA Area Cluster Study Solar |
4.9 MW | Withdrawn / abandoned |
| Solar Solar |
4.9 MW | Withdrawn / abandoned |
| E. Webster substation - NG Western MA Area Cluster Study Solar |
4.9 MW | Withdrawn / abandoned |
| CornerStone Power Monson 2 Solar |
4.9 MW | Withdrawn / abandoned |
| Marshfield 739 - EMA ASO Solar + storage |
4.6 MW | Withdrawn / abandoned |
| Sandwich 916 - EMA ASO Solar + storage |
4.6 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
4.5 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
4.5 MW | Withdrawn / abandoned |
| Individual @ Piper Other |
4.1 MW | Withdrawn / abandoned |
| Wellfleet 976 - EMA ASO Solar + storage |
4.1 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
4.0 MW | Withdrawn / abandoned |
| Harwich 968 - EMA ASO Solar + storage |
4.0 MW | Withdrawn / abandoned |
| HGE Group Study Gas |
4.0 MW | Withdrawn / abandoned |
| Individual @ Partridge Solar + storage |
4.0 MW | Withdrawn / abandoned |
| Group @ Orchard Solar + storage |
4.0 MW | Withdrawn / abandoned |
| E. Winchendon Substation - NG Western MA Area Cluster Study Solar |
3.9 MW | Withdrawn / abandoned |
| Medway 65 110B - 2023 EE GB ASO Solar + storage |
3.9 MW | Withdrawn / abandoned |
| Hopkinton 126 - EMA ASO Solar + storage |
3.9 MW | Withdrawn / abandoned |
| Valley 715 - EMA ASO Solar + storage |
3.7 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
3.6 MW | Withdrawn / abandoned |
| Falmouth 933 - EMA ASO Solar + storage |
3.5 MW | Withdrawn / abandoned |
| Hydro Hydro |
3.3 MW | Withdrawn / abandoned |
| Solar + battery Solar + storage |
3.2 MW | Withdrawn / abandoned |
| Solar Solar |
3.1 MW | Withdrawn / abandoned |
| Paxton BESS Battery storage |
3.0 MW | Withdrawn / abandoned |
| Sheld BESS Battery storage |
3.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
3.0 MW | Withdrawn / abandoned |
| Fisher Road 657 - EMA ASO Solar + storage |
3.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
3.0 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
3.0 MW | Withdrawn / abandoned |
| TMLP Landfill Solar Solar |
3.0 MW | Withdrawn / abandoned |
| Solar Solar |
2.8 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
2.8 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
2.8 MW | Withdrawn / abandoned |
| Solar Solar |
2.7 MW | Withdrawn / abandoned |
| Oswald - WMA ASO Solar + storage |
2.5 MW | Withdrawn / abandoned |
| Solar Solar |
2.5 MW | Withdrawn / abandoned |
| Royalston - NG Western MA Area Cluster Study Solar |
2.5 MW | Withdrawn / abandoned |
| Douglas Woods Wind Unit 12 Onshore wind |
2.5 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
2.5 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)