United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas (2022 requests) — page 6
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Ardesia Storage Battery storage · Ardesia Storage Project LLC |
100 MW | In study |
| Solar project J2952, Chambers County Solar |
100 MW | In study |
| Palmvalley Storage Battery storage |
100 MW | Paused / redesign |
| PSE Richardson TX Storage Battery storage · PureSky Development Inc. |
100 MW | In study |
| Photo BESS 3 Solar + storage · CED Development Inc. |
100 MW | In study |
| SS100S Solar |
100 MW | Agreement signed |
| PSE Minnesota TX Storage Battery storage · PureSky Development Inc |
94.0 MW | In study |
| Camellia Storage Battery storage · Camellia Storage Project LLC |
90.8 MW | In study |
| Demeter Solar Solar + storage · Demeter Solar, LLC |
88.0 MW | In study |
| Ratcliff Solar Solar · Greenalia Solar Power Ratcliff |
85.7 MW | In study |
| Hector Solar Solar + storage · Hector Solar, LLC |
81.6 MW | In study |
| Blarney Solar Solar · Blarney Solar Project LLC |
81.0 MW | Agreement signed |
| Serengeti Solar Solar · Abei Energy Green XIV LLC |
76.2 MW | In study |
| PaleAle BESS Battery storage · Momentum Energy Storage Partners,LLC |
75.4 MW | In study |
| East Blackland Battery Storage SLF Solar + storage · DERIVA ENERGY STORAGE, LLC |
75.0 MW | In study |
| Kildare Solar · Galsol, LLC |
70.0 MW | In study |
| Lamar Unit 1 Repower Gas · La Frontera Holdings, LLC |
66.0 MW | In study |
| Smith Lake Storage DC Solar + storage · Smith Lake Solar |
65.0 MW | In study |
| Demeter Storage Solar + storage · Demeter Solar, LLC |
65.0 MW | In study |
| Nymphaea Storage Solar + storage · Nymphaea Solar, LLC |
61.0 MW | In study |
| Indigo Storage Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| Longfellow BESS I Solar + storage · CENTURY GAS PROCESSING, LLC |
55.0 MW | Agreement signed |
| MRG Goody Storage Solar + storage · MRG Goody Solar Project LLC |
52.3 MW | Agreement signed |
| Blanket Ranch North Storage Solar + storage · Blanket Ranch North Solar, LLC |
50.9 MW | In study |
| Isaac Solar Solar · Industrial Bravo Project LLC |
50.7 MW | Agreement signed |
| Hooper Solar Solar + storage · BT Brown Solar, LLC |
50.5 MW | In study |
| Albatross BESS Battery storage · Albatross Solar, LLC |
50.4 MW | In study |
| SS50S Solar |
50.0 MW | Agreement signed |
| Brightside Solar Alt POI Solar · Brightside Solar, LLC |
50.0 MW | Agreement signed |
| Hector Storage Solar + storage · Hector Solar, LLC |
42.7 MW | In study |
| Blanket Ranch South Storage Solar + storage · Blanket Ranch South Solar, LLC |
34.3 MW | In study |
| Lager Storage Battery storage · Momentum Lager LLC |
31.1 MW | In study |
| Hooper Storage Solar + storage · BT Brown Solar, LLC |
30.7 MW | In study |
| Pitts Dudik II Solar · Pitts Dudik II |
30.2 MW | Agreement signed |
| Kennedy Storage Solar + storage · Kennedy Bypass Solar LLC |
25.3 MW | In study |
| Burro Loco Energy Storage Battery storage · VESI |
25.1 MW | In study |
| Hays Energy Unit 2 Repower Gas · HAYS ENERGY, LLC |
18.0 MW | In study |
| Clutch City Storage I SLF Battery storage |
16.6 MW | Paused / redesign |
| CPS AvR CT1 Rotor Replacement Gas · CPS Energy |
11.3 MW | In study |
| Laureles BESS Battery storage · Regis Laureles LLC |
9.9 MW | Agreement signed |
| Utopia BESS Battery storage · Regis Utopia, LLC |
9.8 MW | Agreement signed |
| Medina Lake BESS Battery storage · Regis Medina Lake LLC |
9.8 MW | Agreement signed |
| Giga Austin Solar Solar · GIGA TEXAS ENERGY LLC |
-53.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)283 · 56.6 GW
- MISO (Midcontinent)6 · 1,095 MW
- SPP (Southwest Power Pool)2 · 693 MW
- West (non-ISO utilities)2 · 150 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)