United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2023 requests) โ page 41
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Other project C3-145, Bonneville County Other |
5.4 MW | Withdrawn / abandoned |
| Scitico DG Cluster Solar + storage |
5.2 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
5.1 MW | Withdrawn / abandoned |
| NG NEMA Group DER Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Leeds 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study Solar |
5.0 MW | Withdrawn / abandoned |
| Solar project 898329, Florence County Solar |
5.0 MW | Withdrawn / abandoned |
| Other project C3-151, Millard County Other |
5.0 MW | Withdrawn / abandoned |
| Solar project C3-071, Box Elder County Solar |
5.0 MW | Withdrawn / abandoned |
| CMP Spring St 115 kV SS - Greater Portland Area DG Study Solar |
5.0 MW | Withdrawn / abandoned |
| Individual @ Montague Battery storage |
5.0 MW | Withdrawn / abandoned |
| Solar + storage project C3-089, Washington County Solar + storage ยท PacifiCorp |
5.0 MW | Withdrawn / abandoned |
| NG NEMA Group DER Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Sturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study Solar |
5.0 MW | Withdrawn / abandoned |
| Solar + storage project C3-118, Duchesne County Solar + storage |
5.0 MW | Withdrawn / abandoned |
| OATT NYISO Tuxedo Project Battery storage ยท Radial Power LLC (Radial Power BESS NY LLC) |
5.0 MW | Withdrawn / abandoned |
| CMP Elm St 115 kV SS - Greater Portland Area DG Study Solar |
5.0 MW | Withdrawn / abandoned |
| CMP Biddeford IP 115 kV SS - Louden-Biddeford Area DG Study Solar |
4.9 MW | Withdrawn / abandoned |
| Lincolnville 115 kV SS - Midcoast Area DG Study Solar |
4.9 MW | Withdrawn / abandoned |
| CMP West Buxton 115 kV SS - Louden-Biddeford Area DG Study Solar |
4.5 MW | Withdrawn / abandoned |
| Battery storage project 898287, Randolph County Battery storage |
4.3 MW | Withdrawn / abandoned |
| Onshore wind project C3-084, Converse County Onshore wind ยท PacifiCorp |
4.2 MW | Withdrawn / abandoned |
| Individual @ Piper Other |
4.1 MW | Withdrawn / abandoned |
| CMP Moshers/Prides Corner 115 kV SS - Greater Portland Area DG Study Other |
4.0 MW | Withdrawn / abandoned |
| Individual @ Partridge Solar + storage |
4.0 MW | Withdrawn / abandoned |
| Group @ Orchard Solar + storage |
4.0 MW | Withdrawn / abandoned |
| Mason 115 kV SS - Midcoast Area DG Study Solar |
3.9 MW | Withdrawn / abandoned |
| Bantam Energy Storage Battery storage |
3.8 MW | Withdrawn / abandoned |
| Pascal Energy Storage Battery storage |
3.7 MW | Withdrawn / abandoned |
| San Ysidro Energy Storage Battery storage |
3.7 MW | Withdrawn / abandoned |
| Frates Battery storage |
3.7 MW | Withdrawn / abandoned |
| Coyote Ranch Energy Storage Battery storage |
3.7 MW | Withdrawn / abandoned |
| Onshore wind project C3-091, Albany County Onshore wind ยท PacifiCorp |
3.6 MW | Withdrawn / abandoned |
| Hydro project 450, Lewis And Clark County Hydro |
3.4 MW | Withdrawn / abandoned |
| Bath 115 kV SS - Midcoast Area DG Study Solar |
3.4 MW | Withdrawn / abandoned |
| Solar project 442, Valley County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project C3-177, Klamath County Solar |
3.0 MW | Withdrawn / abandoned |
| Solar project C3-178, Klamath County Solar |
3.0 MW | Withdrawn / abandoned |
| Coopers Mills 115 kV SS - Midcoast Area DG Study Solar |
2.9 MW | Withdrawn / abandoned |
| Solar project C3-014, Klamath County Solar |
2.5 MW | Withdrawn / abandoned |
| Individual @ French King Solar + storage |
2.2 MW | Withdrawn / abandoned |
| Solar project C3-070, Weber County Solar |
2.0 MW | Withdrawn / abandoned |
| Cayuta Add-on Battery storage ยท Nexamp |
2.0 MW | Withdrawn / abandoned |
| CMP Vallee Lane 115 kV SS - Louden-Biddeford Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Athens 115 kV SS - CMP Wyman Area Study Solar |
2.0 MW | Withdrawn / abandoned |
| Ludden Lane 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Topsham 115 kV SS - Midcoast Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
| Individual @ Amherst Battery storage |
2.0 MW | Withdrawn / abandoned |
| Solar project C3-074, Millard County Solar |
2.0 MW | Withdrawn / abandoned |
| Cayuta Add-on Battery storage ยท Nexamp Solar |
2.0 MW | Withdrawn / abandoned |
| Highland/Park St 115 kV SS - Midcoast Area DG Study Solar |
2.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)486 ยท 198.6 GW
- West (non-ISO utilities)547 ยท 166.5 GW
- SPP (Southwest Power Pool)336 ยท 71.5 GW
- NYISO (New York)138 ยท 40.7 GW
- Southeast (non-ISO utilities)331 ยท 40.7 GW
- ERCOT (Texas)85 ยท 16.1 GW
- ISO-NE (New England)119 ยท 15.7 GW
- MISO (Midcontinent)10 ยท 1,143 MW
- PJM (Mid-Atlantic, Midwest)11 ยท 867 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)