United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Other interconnection queue in the USA — page 3

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown32874.4 GW
Active in queue74.4 GW328 requests
Agreement signed5,506 MW27 requests
Withdrawn1,273328.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

328 requests · page 3 of 7
ProjectCapacityStatusLocationRegionQueuedOnline
Other project Q598, Maricopa County
Other
250 MWIn study Maricopa, AZWest May 2025target 2029
Other project J2691, Bollinger County
Other
250 MWIn study Bollinger, MOMISO Sep 2022target 2027
Other project Q558, Maricopa County
Other
250 MWIn study Maricopa, AZWest May 2024target 2028
Other project Q610, San Juan County
Other
250 MWIn study San Juan, NMWest May 2025target 2029
Other project 100, Pima County
Other
250 MWIn study Pima, AZWest Oct 2021target 2024
Other project 87, Apache County
Other
250 MWIn study Apache, AZWest Dec 2020target 2023
Other project GEN-2022-010, Williams County
Other
250 MWIn study Williams, NDSPP May 20222025
Other project 86, Apache County
Other
250 MWIn study Apache, AZWest Dec 2020target 2023
Other project 95, Apache County
Other
250 MWIn study Apache, AZWest Jun 2021target 2024
Other project 98, Pinal County
Other
241 MWIn study Pinal, AZWest Sep 2021target 2025
Other project GEN-2025-SR10, Seminole County
Other
238 MWIn study Seminole, OKSPP May 2025target 2030
Rio Grand Valley Element Fuels Power
Other · Element H2Gen, LLC
230 MWIn study Cameron, TXERCOT Jun 2024target 2027
Other project Q574, Maricopa County
Other
220 MWIn study Maricopa, AZWest May 2024target 2028
Replacing 220 MW of coal generation with BESS; Trenton Channel 9
Other
220 MWIn study Wayne, MIMISO Oct 2023target 2025
Replacing 30 MW of existing coal generation with BESS at Burlington Generation Station; Burlington 5
Other
212 MWIn study Des Moines, IAMISO Feb 2022target 2024
Other project IA-PNM-2023-10, Mckinley County
Other
210 MWIn study Mckinley, NMWest Jan 2023target 2028
Masroor Storage
Other · Masroor Energy Storage LLC
203 MWPaused / redesign Fannin, TXERCOT Nov 2021target 2025
Snap Jaw BESS
Other · Moccasin Pointe Grid, LLC
201 MWPaused / redesign Harris, TXERCOT Apr 2021target 2028
Other project GEN-2025-SR25, Tulsa County
Other
200 MWIn study Tulsa, OKSPP Jun 2025target 2028
Surplus; J834
Other
200 MWIn study Phillips, ARMISO Feb 2025target 2027
Other project 37681, Platte County
Other
200 MWIn study Platte, WYWest Jul 2025target 2029
Other project Q554, Pinal County
Other
200 MWIn study Pinal, AZWest May 2024target 2030
Other project GEN-2025-SR24, Washington County
Other
200 MWIn study Washington, NESPP Jun 2025target 2028
Other project Q568, Yuma County
Other
200 MWIn study Yuma, AZWest May 2024target 2028
Other project GEN-2025-SR26, Cass County
Other
200 MWIn study Cass, NESPP Jun 2025target 2029
Other project 38047, Platte County
Other
200 MWIn study Platte, WYWest Jul 2025target 2029
Other project Q585, Maricopa County
Other
200 MWIn study Maricopa, AZWest May 2025target 2030
Other project 110, Pima County
Other · TEP
200 MWIn study Pima, AZWest Dec 2021target 2024
Other project GEN-2023-059, Harrison County
Other
200 MWIn study Harrison, TXSPP Sep 2023target 2029
Other project Q605, Maricopa County
Other
200 MWIn study Maricopa, AZWest May 2025target 2031
Other project Q604, Pinal County
Other
200 MWIn study Pinal, AZWest May 2025target 2030
Other project 38412, Goshen County
Other
200 MWIn study Goshen, WYWest Jul 2025target 2029
Other project 109, Pima County
Other · TEP
200 MWIn study Pima, AZWest Dec 2021target 2024
Other project 77, Apache County
Other
200 MWIn study Apache, AZWest Feb 2020target 2023
Other project 609, Sweetwater County
Other · NextEra Energy Resources Interconnection Holdings, LLC
200 MWPaused / redesign Sweetwater, WYWest Jun 2021target 2025
Other project 108, Pima County
Other · TEP
200 MWIn study Pima, AZWest Dec 2021target 2024
Other project Q573, Pinal County
Other
200 MWIn study Pinal, AZWest May 2024target 2028
Other project PP00048, Onslow County
Other
199 MWIn study Onslow, NCSoutheast Aug 2025target 2030
Other project 977328, Robeson County
Other
199 MWIn study Robeson, NCSoutheast Jun 2025
Other project PP00047, Robeson County
Other
199 MWIn study Robeson, NCSoutheast Aug 2025target 2030
Other project PP00049, Onslow County
Other
199 MWIn study Onslow, NCSoutheast Aug 2025target 2030
Other project Q590, Maricopa County
Other
180 MWIn study Maricopa, AZWest May 2025target 2028
Other project Q565, Coconino County
Other
161 MWIn study Coconino, AZWest May 2024target 2025
Other project Q612, Coconino County
Other
161 MWIn study Coconino, AZWest May 2025target 2028
Other project G0969, Linn County
Other
160 MWIn study Linn, ORWest Oct 2023target 2028
Other project G0970, Polk County
Other
160 MWIn study Polk, ORWest Oct 2023target 2028
Other project G0971, Lane County
Other
160 MWIn study Lane, ORWest Oct 2023target 2028
Other project G0886, Linn County
Other
160 MWIn study Linn, ORWest Jun 2023target 2030
Other project G0794, Linn County
Other
160 MWIn study Linn, ORWest Aug 2022target 2028
Other project G0793, Linn County
Other
160 MWIn study Linn, ORWest Aug 2022target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)